Laserfiche WebLink
TABLE 1 <br /> <br /> MONTHLY DISTRIBUTION FOR DEPLETION & REPLACEMENT REQUIREMENTS <br /> <br /> LOVELAND READY-MtX COM BINED PLAN-LARIMER PIT AND MARIANA BUTTE PIT <br /> <br /> <br /> <br />- ACCRETIONS& MONTHLY <br /> <br />MARIANA <br />TOTAL <br />DEPLETIONS <br />EXCESS REPLACEMENT <br /> <br />LARIMER PIT <br />BUTTE PIT <br />LAGGED <br />FROM <br />OR DEFICIT <br />REPL SUMMER WINTER WATER PROVIDED EXCESS CREDITS <br /> <br />MONTH <br />LAGGED <br />LAGGED <br />COMBINED <br />120 BARNES DITCH <br />AFTER THE BARNES ACEMENT RETURN RETURN BY THE CITY OF LOVELAND AVAILABLE FOR <br /> <br />DEPLETIONS <br />DEPLETIONS <br />DEPLETIONS <br />INCHES <br />DITCH INCHES PROVIDED BY <br />BT <br />C FLOW FLOW LEASE OF FULLY STORAGE IN PITS 16 AND 17 <br /> <br />AF <br />1 <br />AF <br />(2 <br />AF <br />(3) <br />AF <br />4 <br />AF <br />5 - <br />PROJECT WATER <br />AF OBLIGATION <br />AF OBLIGATION <br />AF CONSUMABLE EFFLUENT <br />AF PURSUANT TO 98CW431 <br />AF <br /> <br />MARCH (OS <br />2.13 <br />0.28 <br />2.41 <br />-0 <br />10 <br />-2 <br />51 (6 (7 (8) 9 10) <br /> <br />APRIL(08) <br />3.16 <br />0.37 <br />3.53 . <br />0 <br />00 . <br />-3 <br />53 0.00 0.10 2.51 0.00 <br /> <br />MAY(06) <br />1.71 <br />0.53 <br />2.24 . <br />58 <br />77 . <br />56 <br />53 3.53 0.00 0.00 p.00 <br /> <br />JUNE(OS) <br />7:08 <br />0.69 <br />7.77 . <br />68 <br />24 . <br />60 <br />47 0.00 14.20 0.00 56.53 <br /> <br />JULY(OB) <br />8.51 <br />0.99 <br />9.50 . <br />69 <br />29 . <br />59 <br />79 0.00 25.80 0.00 60.47 <br /> <br />AUGUST(08) <br />8.18 <br />1.09 <br />9.27 . <br />39 <br />20 . <br />29 <br />93 0.00 31.70 0.00 59.79 <br /> <br />SEPTEMBER(08) <br />5.89 <br />0.97 <br />6.86 . <br />10 <br />10 . <br />3 <br />24 0.00 27.80 0.00 29.93 <br /> <br />OCTOBER(OS) <br />4.56 <br />0.79 <br />5.35 . <br />4 <br />59 . <br />-0 <br />76 0.00 16.90 0.00 3.24 <br /> <br />NOVEMBER(OS) <br />3.06 <br />0.54 <br />3.60 . <br />-4 <br />40 . <br />8 <br />0p 0.76 9.40 000 0 ~ <br /> <br />DECEMBER OB) <br />2.21 <br />0.37 <br />2.58 . <br />-1 <br />50 - <br />. <br />4 <br />08 0.00 4.40 8.00 0.00 <br /> <br />JANUARY(09) <br />2.01 <br />0.27 <br />2.28 . <br />-0 <br />50 - <br />. <br />2 <br />78 0.00 1.50 4.08 0.00 <br /> <br />FEBRUARY(09) <br />2.73 <br />0.23 <br />96 <br />2 . <br />-0 <br />20 - <br />. 0.00 0.50 2.78 p.pp <br /> <br />TOTAL <br />51.23 <br />7.12 . <br />58.35 . <br />243 <br />49 -3.16 0.00 0.20 3.16 0.00 <br /> . 4.29 125.80 6.70 20.53 209.96 <br /> <br /> <br />(t) Total lagged mi nim depletions at th e Larimer pit <br />(2)Total la evaporation de letions at the Mariana Butt e Pit <br />(3)Total combined la depletions (1)+(2) <br />(4),4aretions and de letions to river from 120 Games D'dch inches per case no. 2000CW143 <br />(5) Mordhy excess and defidt after the Games Ditch inches (4}(3) <br />(6) Replacement provided the C-BT water <br />A total <br />f 4 <br />29 <br />. <br />o <br />. <br />acre-feet from 8.57 of C-BT units water leased from the C~ of Lov <br />(7) Summer Return flow to be returned directly to the Bi Thom son River upsteam of Loveland and Greele Canal <br />(8) Winter Return flow obligation <br />(9) Replacement water provided by the City of Loveland lease of ful consumable effluent eland was a proved for use in this plan by the NCW CD, based on a net yield of 50% of fhe net <br /> C-BT water <br />(10) Excess cxedits available for story a in Pits 16 and 17 pursuant to case no <br />98CW431 <br />. <br /> <br /> <br /> <br /> <br /> <br />Loveland Ready Ma combined mouthy distribution and replacements(08) <br />