My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP00012 (3)
DRMS
>
Back File Migration
>
Report
>
REP00012 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2013 10:56:47 AM
Creation date
3/31/2008 10:42:50 PM
Metadata
Fields
Template:
Z_TEMP_REPORT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brian Munson <br />-3- March 3, 1981 <br />In view of the extent of the work that needs to be completed by the appli- <br />cant, I am pessimistic that the applicant can complete the analysis in time to <br />satisfy the 120 day review deadline. I recommend, therefore,the applicant be <br />informed immediately of the extent ofthese deficiencies in order that they may <br />Portion of the excess spoil pile is subject to the requirements of Rule 2.05.3 <br />(3)(b) and 2.07.6(3). As such, if the existing portions of the excess spoil <br />pile are found to not be in conformance with the design requirements or per- <br />formance standards of Rule 4.09, the applicant will have to prepare and <br />submit a compliance plan explaining how the structure will be brought into <br />conformance with those regulatory requirements within six months after issuance <br />of the permanent program permit. <br />mab <br />Attachment <br />cc: Fred Banta <br />
The URL can be used to link to this page
Your browser does not support the video tag.