Laserfiche WebLink
01/16/2007 06:2t3 3032670680 FERFi0U5 ~Et11(.;F1N (.~U F'ACit bb/E75 <br />• <br />Colorado bepartment o.f Public F-ieahh and En~7ronment <br />Northfield Partners LLC ~Norttifteld Ca.tl Mine Air Po!'tution Control Division <br />Permit No. 06FR0796F <br />Initial Approval <br />• G>CNEY2AI, TF,RMS AND Ct~IVDITIONS: i1Tp ~ <br />TANT•_ KEAD i7EMS 5.6.7 A11D Sl <br />1. This permit is issued in reLance upon the acpuracy and eonipletett~s of infomrati.on supplied by the <br />applicarn and is conditioned upon conduct of the activity, or construction, installation and operation ofthe <br />source, in accordance with ft is information and with .representations mach oy the applicant or applicant's <br />sgents. It is valid only for the equipment and operations or activity specifically identified on the permit. <br />2• Unless specifically stated oth:nvise, the general and specific conditions contained in this permit have bcea <br />dctetTtiined by the APC17 ro be accessary td assure compliance with the provisions of Section 25-7- <br />I I4.S(7)(a), C.A.S. <br />~ • Each and every condition of t~is perrttit is a material part hereofand is not severable. Any challenge to or <br />appeal o>y a condition hereeft.hall constitute a rejection ofthe orttire permitand upon such aecurrence, this <br />permit shall be deemed denied ab initfo. This Permit may be revoked at any time prior to fna? a <br />the Air Pollution Control Division (APCD) on Bounds set forth in the Colorado Air Quality Co~ 1 Act <br />and regulations ofthe Air Quality Control Commission (AQCC), including failure to rneetany express term <br />or condition ofthe permit. If tie bivision denies a permit, conditions imposed upon a permit are contested <br />by the applicant, or the Division revokes a petm.it, the applicant oc owner or cpertttor of a source may <br />request a hearing before the AQCC for review of the, >:iivision's action. <br />4• This permit and any required attachments must be retained and made available for ins ti~u~,;~t~~, _~,.,, <br />_~ _ at the location sgLforcn,..~+espa~{~, ~; ~c~~hai ismoved to a new location, a copy of <br />'-the fteloeapon Notice (required by law to be submitted to the APCD whenever a portable solute is <br />relocated) should be attac.Fed to this permit. The permit maybe reissued to a new owner by tFe APCD.as <br />provided in AQCC Regulation No. 3, Part B; Section II.B, upon a request for transfer ofew arship and the <br />submittal o.f a revised AFEN a td the required fee. <br />5. Issuance (initial approval) of :ut emission permit does not provide "final" authorif<' far this activity or <br />operation of this source. Final approval of the petrnit must be secured from the APCD ir. writing in <br />_ accordance with the provisions of 2t_7.! Iq,S(12)(a) C.R.S. and AQCC Regulation No. 3, Part B, Soc:ion <br />TLG. Final approval cartnor be granted until the operation or activity commences and has been verified by <br />• the APCD as conforming in alt respects with the conditions of the permit. If the APCD so determines, it <br />`viii Provide wzitten document.ition of such final approval, which does constitute "ftnaP' authority to <br />operate. Compliance wltJi fh.r permit conditlotrs tttust b¢ de»,onsttaterd wPt)rin 180 da}~s after <br />commencement of ~per4rion. <br />ti. ?HIS PlvRMIT AUTOMATrt;ALLY EYP.T.RES IF you {1) do not commence constriction or operation <br />within 18 months after either the date of issuance of this perrttit or the date on which such construction ar <br />activity was scheduled to corn.mence as set forth in the permit, whichever is later: (2) discontinue <br />construction far a period of l8 months or mo*.r, or (3} do not cozrp!ete construction within a reasonable <br />time of 9ie estimated compieiio;t date. Extcnsicns of the expiration date may be granted by the APCD <br />upon a shov<•ing ofgeod cause b;y G5e p~ttrrittee prior to the expiration date. <br />7• YOU MUST' notify the APC.I) at least thirty days (fifteen days for portable sources <br />commencement o.f t}te permitted operation oractivity. Failure to do so is a violation of S ~ont25-7- <br />114.5{l2)(a), C.R.S. and AQCC iegulation No. 3, Part B, Section 1i.I.G. I.., and can result in the revocation <br />of the permit. You mart dentcnstrale co~rpJianee ,,,;trF+ the permit conditions wtthiri 18t1 dQys after <br />contmencenaerrt ofoperatr'ori as stated in condltior S. <br />$. Section 2S-7-I 14.?(2xa}, C.R.S. requires that ail sources required to f Ie an qtr Pollution Emissionl~otice <br />(APEN) must pay an annual fee to cover the costs of inspections and administration. if a soarce or <br />activity is to be discontinued, d'+e «~vner must notif}•the.Division in writing requesting a cancellation ofthe <br />permit. Upon notification, annua fee bluing w711 terminate. <br />9. ~`iolation ofthe terms ofa permit ur oftbe provisions ofthe Colorado Air Pollution Prcvernion and content <br />Act or the regulations of the gQr~r may result in administrative, civil or criminal enforcement actions <br />under S:.ctions 25-7-t.15 (enforcement,-, -i2I (injunctions), -122 (eivi.l. p,,aa]ties~ _122.,1 (criminal <br />penalties), C.R.S. <br />• <br />ATRS Point ID: 043/0143/4t}1 <br />Page 5 of 5 <br />