Laserfiche WebLink
SEDCAD 4 for Windows <br />(:nnvrinh4 900R _9M9 Pamch I Crh~.,oh <br />5 <br />Structure Detai/; <br />Structure #1 (Pond <br />Sediment Pond I/o/ume <br />Pond Inputs: <br />Initial Pool Elev: 5,394.00 ft <br />Initial Pool: 1.74 ac-ft <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />5,394.00 28.00 3.00:1 3.00:1 10.00 <br />Pond Results: <br />Peak Elevation: 5,394.82 ft <br />Dewater Time: 3.03 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br /> <br />Elevation Area <br /> <br />(ac) Capacity <br /> <br />(ac-ft) Discharge <br /> <br />(cfs) Dewater <br />Time <br />(ham) <br />5,391.50 0.630 0.000 0.000 <br />5,392.00 0.660 0.322 0.000 <br />5,392.50 0.685 0.659 0.000 <br />5,393.00 0.710 1.007 0.000 <br />5,393.50 0.735 1.369 0.000 <br />5,393.90 0.755 1.667 0.000 <br />5,394.00 0.760 1.742 0.000 Spillway #1 <br />5,394.10 0.766 1.819 0.032 28.59* <br />5,394.20 0.772 1.896 0.065 14.41* <br />5,394.50 0.790 2.130 0.161 17.55* <br />5,394.82 0.809 2.387 15.797 12.15 Peak Stage <br />5,395.00 0.820 2.532 24.669 <br />5,395.50 0.845 2.949 56.242 <br />5,396.00 0.870 3.377 96.142 <br />*Designates time(s) to dewater have been extrapolated beyond the So hour hydrograph limit. <br />Filename: 25yr-24hr Sediment Pond Spillway.sc4 Printed 05-08-2007 <br />