Laserfiche WebLink
GENERAL CONDITIONS <br />1. Before a federal licensee or permittee commences any project in a watercourse, <br /> which project may adversely affect water quality, it shall notify, at least fifteen days <br /> prior to commencing work, the following: <br /> A. Applicable local heatth department; <br /> B. Owners or operators of municipal and domestic water supply intakes which <br /> are located within twenty miles downstream from the site of the project; and <br /> C. Owners or operators of.other intakes or diversions which are located within <br />- ~- ~ - five miles downstream from the site of the project. - <br />2. Construction operations in watercourses and water bodies shall be restricted to <br />~ <br />~ areas specified in the application for the federal license or permit. <br />, <br />3 Permanent erosion and sediment control measures shall be installed at the earliest <br />. <br />- practicable time consistent with good construction practic°s and shall be <br /> maintained as necessary throughout the operation. of the project. One of the first <br /> construction activities shall be the placement of permanent and temporary erosion <br /> and sediment control measures around the perimeter of the project of-the initial <br />- work areas to protect the project water resources. ~ - <br />. <br />- <br /> <br />4. .. <br />- _ <br />__ <br />Temporary erosion and sediment control measures shall be coordinated with <br />and continuous control <br />effective <br />economical <br />s <br />- <br />'-~ , <br />, <br />ure <br />as <br />~ permanent measures to <br />throughout the construction phase and during the operation of the project. <br />5. Work should be carried out diligently and completed as soon as possible. <br />6 The use of chemicals such as soil stabilizers, dust palliatives, sterilants, growth <br />. fertilizers, deicing salts, etc., during construction and operation should <br />inhibitors <br /> , <br />be limited to the best estimate of optimum application rates. All reasonable <br /> measures shall betaken to avoid excess application and introduction of chemicals <br /> into the waters. <br />7. Measures shall be taken to prevent spilled fuels, Lubricants, or other toxic materials <br /> from entering the watercourse. <br />S Whenever practicable, discharges of dredged or fill materials shall be conducted <br />. during low flow periods, during periods when spawning is not occurring and during <br />"~~ periods when recreational use is relatively low. If such discharges will occur when <br /> water temperatures are near freezing and where a domestic water supply diversion <br /> is located within twenty miles downstream, the permittee shall coordinate with the <br /> water purveyor in order to minimize impacts on treated water quality. <br /> (over) <br />