Laserfiche WebLink
Table 2. Sediment transport rates, volumes, and length of channel erosion. <br />Sediment Transport per the Meyer-Peter bedload equation <br />where gs is measured in Ib/(ft sec) <br />9S=[39.25gv3S - 9.95dsol~ <br />Assume: dam= 0.0025 [inches] <br />S = 0.019 <br />Channel width = 1100 [feet] <br />Density of soil = 110 [Ib/fto] <br />Channel depth = 6 (ft] <br /> 100-yr Hydrogra phs <br />Sediment Transport <br />Transport <br />Transport <br />3 <br />Total Flow Right OB Flow Duration Rate (Ib/[ft sec]) Weight (tons) Volume (ft <br />) <br />cfs cfs) hr) <br />000 <br />6 300 0.5 0.2 172 3,130 <br />, <br />000 <br />7 482 0.3 0.3 166 3,026 <br />, <br />000 <br />8 1,277 0.3 0.7 442 8,044 <br />, <br />000 <br />9 1,780 0.2 1.0 411 7,481 <br />, <br />000 <br />10 2,336 0.3 1.4 810 14,733 <br />, <br />000 <br />11 2,944 0.3 1.7 1,022 18,575 <br />, <br />000 <br />12 3,633 0.4 2.1 1,681 30,571 <br />, <br />000 <br />13 4,378 0.4 2.6 2,027 36,848 <br />, <br />000 <br />14 5,319 0.4 3.1 _ 2,463 44,777 <br />, <br />000 <br />15 6,288 0.6 3.7 4,368 79,414 <br />, <br />000 <br />16 7,262 0.9 4.2 7,567 137,589 <br />, <br />000 <br />17 8,223 5.2 4.8 49,513 900,243 <br />, <br />000 <br />16 7,262 1.3 4.2 10,931 198,740 <br />, <br />000 <br />15 6,288 1 3.7 7,280 132,357 <br />, <br />14,000 5,319 0.8 3.1 4,925 89,554 <br />000 <br />13 4,378 0.8 2.6 4,053 73,696 <br />, <br />000 <br />12 3,633 0.6 2.1 2,522 45,856 <br />, <br />000 <br />11 2,944 0.7 1.7 2,384 43,341 <br />, <br />000 <br />10 2,336 0.6 1.4 1,621 29,466 <br />, <br />000 <br />9 1,780 0.6 1.0 1,234 22,442 <br />, <br />000 <br />8 1,277 0.6 0.7 885 16,088 <br />, <br />000 <br />7 482 0.7 0.3 388 7,060 <br />, <br />6,000 300 1.1 0.2 379 6,886 <br />Totals <br />For the cutoff channel, this volume <br />corresponds to a length of: <br />295 feet <br />Increase this quantity by 50% for <br />a factor of safety, resulting in a length of: <br />443 feet <br />107,245 1,949,916 <br />tons ft3 <br />