Laserfiche WebLink
TABLE OF CONTENTS <br />I. INTRODUCTION ...............................................................................................................1 <br />II. LAYOUT CONSTRAINTS .................................................................................................2 <br />2.1 Setbacks and Right-of-Ways ............:.......................................................................2 <br />2.2 Development and Utility Easements ........................................................................4 <br />2.3 DeI-th of Mining .......................................................................................................4 <br />2.4 Hydraulic and Hydrologic Constraints .................:..................................................5 <br />III. PROPOSED CONCEPTUAL FINAL LAYOUT ...............................................................7 <br />3.1 Land Use ..................................................................................................................7 <br />3.2 Hydraulic Structures ................................................................................................9 <br />3.3 System Capacities and Opera~ion ..........................................................................12 <br />IV. ECONOM][C ANALYSIS ........................................................................................:........IA~ <br />V. RECOMMENDATIONS ............:......................................................................................19 <br />5.1 Economic Analysis ................................................................................................19 <br />5.2 Proposed Final Layout ...........................................................................................19 <br />5.3 Procedure for Future Mining .........................................................:.......................21 <br />5.4 Ope;ration of SWSP ................................................................................................22 <br />VI. REFERENCES .......................:..........................................................................................24 <br />LIST OF FIGURES <br />Figure 2.1 Development, Utility Easements, and Setbacks with Mining Phase Map ...............3 <br />Figure 3.1 Conceptual Final Layout with Transfer Culverts and Pump Station .......................8 <br />Figure 3.2 Pond Embankment, Water Surface, and Invert Profiles of Proposed Fina1...........10 <br />Layout <br />Figure 4.1 Optional Final Layout with 12" Gravity Outlet .....................................................17 <br />Figure 4.2 Optional Final Layout with Transfer Culverts 8" Gravity Outlet and ...................19 <br />Pump Station <br />T.~IOPEMCadkcOllcodkc0/.fi~~n! report tocdoc 1 ANdER50N CONSULTING ENGINEERS, ANC. <br />