My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-04_GENERAL DOCUMENTS - M1989056
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1989056
>
2008-02-04_GENERAL DOCUMENTS - M1989056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:04 PM
Creation date
3/31/2008 9:26:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989056
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/4/2008
Doc Name
Plan for Don Kehn Construction
From
Anderson Consulting Engineers, Inc
To
Don Kehn Construction
Email Name
ESC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />I. INTRODUCTION ...............................................................................................................1 <br />II. LAYOUT CONSTRAINTS .................................................................................................2 <br />2.1 Setbacks and Right-of-Ways ............:.......................................................................2 <br />2.2 Development and Utility Easements ........................................................................4 <br />2.3 DeI-th of Mining .......................................................................................................4 <br />2.4 Hydraulic and Hydrologic Constraints .................:..................................................5 <br />III. PROPOSED CONCEPTUAL FINAL LAYOUT ...............................................................7 <br />3.1 Land Use ..................................................................................................................7 <br />3.2 Hydraulic Structures ................................................................................................9 <br />3.3 System Capacities and Opera~ion ..........................................................................12 <br />IV. ECONOM][C ANALYSIS ........................................................................................:........IA~ <br />V. RECOMMENDATIONS ............:......................................................................................19 <br />5.1 Economic Analysis ................................................................................................19 <br />5.2 Proposed Final Layout ...........................................................................................19 <br />5.3 Procedure for Future Mining .........................................................:.......................21 <br />5.4 Ope;ration of SWSP ................................................................................................22 <br />VI. REFERENCES .......................:..........................................................................................24 <br />LIST OF FIGURES <br />Figure 2.1 Development, Utility Easements, and Setbacks with Mining Phase Map ...............3 <br />Figure 3.1 Conceptual Final Layout with Transfer Culverts and Pump Station .......................8 <br />Figure 3.2 Pond Embankment, Water Surface, and Invert Profiles of Proposed Fina1...........10 <br />Layout <br />Figure 4.1 Optional Final Layout with 12" Gravity Outlet .....................................................17 <br />Figure 4.2 Optional Final Layout with Transfer Culverts 8" Gravity Outlet and ...................19 <br />Pump Station <br />T.~IOPEMCadkcOllcodkc0/.fi~~n! report tocdoc 1 ANdER50N CONSULTING ENGINEERS, ANC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.