My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-04_GENERAL DOCUMENTS - M1989056
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1989056
>
2008-02-04_GENERAL DOCUMENTS - M1989056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:04 PM
Creation date
3/31/2008 9:26:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989056
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/4/2008
Doc Name
Plan for Don Kehn Construction
From
Anderson Consulting Engineers, Inc
To
Don Kehn Construction
Email Name
ESC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4.3 Benefit-Cost Analysis of Option 1. <br />enefits: <br />Sale of 1010.4 AF of Storage = $2,526,000.00 <br />Lease of 194.3 AF Aug. over 50 Yrs. _ $614,705.53 <br />ota1= $3,140,705.53 <br />Costs: <br />Costrucfion of Ponds = $1,161,845.04 <br />ortable Diesel Pump = $6,000.00 <br />ug. Transfer Pumping Costs = $3,103.08 <br />12" Gravity Outlet for Ponds 2 & 3 = $348,538.50 <br />Oulet Ditch /Flume = $2,750.00 <br />Grade Control Structure = $166,500.00 <br />otal = $1,688,736.62 <br /> <br />/C Ratio = 1.9 <br />Table 4.4 Benefit-Cost Analysis of Option 2. <br />enefits: <br />Sale of 1010.4 AF of Storage = $2,526,000.00 <br />ease of 194.3 AF Aug. over 50 Yrs. _ $614,705.53 <br />ota1= $3,140,705.53 <br />Costs: <br />Costruction of Ponds = $1,161,845.04 <br />and to Pond Culverts /Gates = $54,019.50 <br />1 cfs Electric Pum Station = $3,871.00 <br />50-year 1 cfs Pumping Costs = $8,656.21 <br />8" Gravity Outlet for Ponds 1,2 & 3 = $325,324.50 <br />Oulet Ditch /Flume = $2,750.00 <br />Grade Control Structure = $166,500.00 <br />ota1= $1,722,966.25 <br /> <br />/C Ratio = 1.8 <br />The principal attribute of this option is the construction of a 12 inch PVC pipeline to <br />allow for the release of water to the Poudre River by gravity. The attractiveness of a gravity <br />outlet is based upon the idea that it is less complex than a pump station and probably, in the long <br />term, more reliable. We have proposed an alignment and elevation data for this pipeline in <br />Figure 4.1. Initially, the concept of a gravity outlet would seem ideal for the operation of the <br />proposed ponds; however, the proximity of the property to the river will only allow for the <br />gravity drainage of Ponds 2 and 3. Unfortunately, in order to maintain fall throughout the <br />pipeline a substantial amount of dead pool would be left in Pond 3, which would have to be <br />T:IOPEMCodkc011codkc0l inn! report.doc 16 ANCIERSON CONSULTING ENGINEERS, ANC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.