My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-25_PERMIT FILE - M2008017 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008017
>
2008-03-25_PERMIT FILE - M2008017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:04 PM
Creation date
3/25/2008 1:44:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008017
IBM Index Class Name
PERMIT FILE
Doc Date
3/25/2008
Doc Name
112 Operation Reclamation Permit Application (part 2)
From
Broken Arrow Investments, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL COMMENTS <br />_.. This report has been prepared to aid in the evaluation of the property and to <br />assist the architect and/or engineer in the design of this project. In the event any <br />changes in the design of the structures or their locations are planned, the <br />conclusions and recommendations contained in this report will not be considered <br />valid unless said changes are reviewed and conclusions of this report modified or <br />approved in writing by Two Rivers Testing, Inc., the geotechnical engineer of <br />-- record. <br />The professional judgments expressed in this report meet the standard care of <br />our profession. Every effort was made to provide comprehensive site coverage <br />through careful locations of the test borings, while keeping the site investigation <br />economically viable. Variations in soil and ground water conditions between test <br />,- borings may be encountered during construction. In order to permit correlation <br />between the reported subsurface conditions and the actual conditions and <br />specifications as originally contemplated, it is recommended Two Rivers Testing, <br />Inc. be retained to perform continuous construction review during the slurry wall <br />installation. Two Rivers Testing, Inc. assumes no responsibility for compliance <br />with the recommendations included in this report unless they have been retained <br />-- to perform adequate on-site construction review during the course of <br />construction. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.