My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-25_PERMIT FILE - M2008017
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008017
>
2008-03-25_PERMIT FILE - M2008017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:26:04 PM
Creation date
3/25/2008 1:39:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008017
IBM Index Class Name
PERMIT FILE
Doc Date
3/25/2008
Doc Name
112 Operation Reclamation Permit Application (part 1)
From
Broken Arrow Investments, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Application rate is for drilling the seed. If seed is to be broadcast, the <br />application rate will be doubled. <br />**Use M corrhiza to coat the seed at time of planting for best results. <br />Upland grass seed will be planted with a drill equipped with depth bands and press <br />wheels. The seed should be drilled in the spring in the month of April for best results. <br />The seeded areas will then be covered with straw mulch at a rate of 2,000 pounds per <br />acre. The straw will be crimped into the soil to control erosion until the grass becomes <br />established. <br />If a significant invasion of noxious weeds occurs after seeding, the weeds will be <br />mowed before they can go to seed. The areas will be mowed periodically for additional <br />control as needed. Mechanical control will be used as a first priority. Chemical methods <br />will only be used if no other alternative produces acceptable results. <br />Water -General Requirement <br />To minimize the effect on the prevailing hydrologic balance, the operator shall: <br />a. Comply with all applicable Colorado water laws. <br />b. Comply with all applicable Federal and State water quality laws and regulations. <br />c. Comply with all Federal and State requirements for dredge and fill. <br />d. Re-grade and backfill all sediment and siltation structures after mining is <br />completed. <br />Groundwater - Specific Requirements <br />The operation will not affect groundwater quality on or off the site. The operation will <br />comply with State groundwater quality standards. Due to the absence of sources of <br />potential pollutants, groundwater quality monitoring is not required in this operation. <br />The mining and reclamation will affect the groundwater table surrounding the mine site. <br />Proposed mitigation efforts to minimize these impacts are a recharge pond along the <br />southeast corner of the property to maintain groundwater levels during the mining, and <br />a perimeter drain if needed to convey groundwater around the lined reservoir after the <br />slurry wall is installed. Broken Arrow Investments, LLC proposes that the groundwater <br />elevations be monitored through both onsite and offsite wells before, during, and after <br />the mining and reclamation is complete so that impacts to the groundwater table, from <br />this mining operation, can be identified and addressed. It is the intent of Broken Arrow <br />Investments, LLC to operate responsibly and to mitigate damages to wells that are <br />directly attributable to the mining and reclamation of this site. For more specific <br />information please refer to the well owner agreements and narrative included in Exhibit <br />G. <br />- Derr Pit Ptoject <br />J&T Consulting, Inc. DRMS 112 Permit <br />V 1 23
The URL can be used to link to this page
Your browser does not support the video tag.