My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-21_GENERAL DOCUMENTS - C1980007 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2008-03-21_GENERAL DOCUMENTS - C1980007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 1:43:49 PM
Creation date
3/25/2008 12:10:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/21/2008
Doc Name
Proposed Decision & Findings of Compliance for PR12
From
add 1,517 acres/Dry Fork Lease
Permit Index Doc Type
Findings
Email Name
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL HYDROLOGY REPORTS ARE TO INCLUDE AN ASSESSMENT OF THE IMPACTS OF THE <br />LOWER WASTE PILE TO THE HYDROLOGIC BALANCE DURING THE PREVIOUS YEAR. <br />STATUS: COMPLIED WITH 5/18/1987 <br />Stipulation No. 9 <br />ANNUAL HYDROLOGY REPORTS ARE TO INCLUDE, PURSUANT TO RULE Z.O4.7(1)(B), A MAP <br />SHOWING THE PIEZOMETRIC SURFACE OF THE COLLUVIAL AQUIFER IN THE AREA OF THE <br />LOWER PERMANENT UNDERGROUND DEVELOPMENT WASTE PILE, IF ONE DEVELOPS. <br />STATUS: COMPLIED WITH 5/13/1988. <br />Stipulation No. 10 <br />THE DIVISION DIRECTS MOUNTAIN COAL COMPANY TO COMPLETE A THOROUGH <br />RECONNAISSANCE GEOLOGIC MAPPING OF THE PROPOSED UPPER WASTE PILE ACCESS <br />ROADWAY CORRIDOR. THE APPLICANT SHALL PLACE SPECIFIC EMPHASIS UPON THE <br />DETECTION OF SLOPE INSTABILITY EVIDENCE AND DRAINAGE CHARACTERISTICS OF THE <br />PROPOSED ROAD ALIGNMENT. FURTHER THE DIVISION DIRECTS MCC, UTILIZING THE <br />RESULTS OF THE MAPPING, AND EARLIER ADJOINING SURFACE FACILITY ROAD DESIGN <br />STUDIES, IF APPROPRIATE, TO COMPLETE A PRELIMINARY ACCESS ROAD CUT-SLOPE <br />STABILIZATION AND DRAINAGE DESIGN. THE MAPPING AND PRELIMINARY DESIGN SHALL BE <br />APPROVED BY THE DIVISION, IN WRITING, PRIOR TO ANY DISTURBANCE OF THE ACCESS ROAD <br />CORRIDOR. <br />STATUS: TERMINATED 5/28/1992. <br />Stipulation No. 11 <br />THE DIVISION DIRECTS MCC TO CONSTRUCT THE UPPER WASTE PILE ACCESS ROAD AS AN <br />INITIAL PIONEER ROAD WITH MINIMIZED EXCAVATION. UPON EXPOSURE OF THE EXCAVATED <br />CUT-SLOPES OF THAT PIONEER ROADWAY THE OPERATOR SHALL COMPLETE A FINAL <br />GEOTECHNICAL INVESTIGATION OF THE ACCESS ROAD CORRIDOR. THIS GEOTECHNICAL <br />INVESTIGATION SHALL BE COMPLETED BY APPROPRIATELY QUALIFIED PROFESSIONAL <br />GEOLOGICAL OR ENGINEERING PERSONNEL. THE PURPOSE OF THIS FINAL INVESTIGATION <br />SHALL BE TO VERIFY, OR APPROPRIATELY AMEND, THE FINDINGS OF THE RECONNAISSANCE <br />GEOLOGIC MAPPING OF THE ROADWAY CORRIDOR. <br />FURTHER, MCC, UTILIZING THE FINDINGS OF THE FINAL GEOTECHNICAL INVESTIGATION, <br />SHALL COMPLETE A FINAL ENGINEERED CUT-SLOPE AND DRAINAGE DESIGN FOR THE UPPER <br />WASTE PILE ACCESS ROAD. THIS FINAL DESIGN SHALL BE APPROVED BY THE DIVISION, IN <br />WRITING, AND THE CONSTRUCTION COMPLETED IN ACCORDANCE WITH THAT DESIGN, PRIOR <br />TO THE TRANSPORTATION OF ANY WASTE MATERIAL ALONG THE ACCESS ROAD. <br />STATUS: TERMINATED 5/28/1992. <br />S7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.