My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-21_GENERAL DOCUMENTS - C1980007 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2008-03-21_GENERAL DOCUMENTS - C1980007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 1:43:49 PM
Creation date
3/25/2008 12:10:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/21/2008
Doc Name
Proposed Decision & Findings of Compliance for PR12
From
add 1,517 acres/Dry Fork Lease
Permit Index Doc Type
Findings
Email Name
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
uses. Another proposed freshwater pond, FW-2, has not been constructed at this time and is not <br />planned for construction during this permit term. <br />Topsoil storage areas are located on the east side of the surface facilities. This is known as the <br />main topsoil stockpile and will be used during reclamation to cover the majority of the <br />disturbance to a depth of 12 to 18 inches. Other topsoil and subsoil piles are located south of the <br />lower refuse pile and on the reclaimed benches. These piles will primarily be used to cover the <br />refuse pile with 18 to 24 inches of soil. <br />Of the approximate 17,155 acres in the permit area (which includes the PR-12 expansion), <br />approximately 402 acres are disturbed, which primarily includes surface facilities and methane <br />degas pads. <br />Upon cessation of mining at the West Elk Mine, reclamation will return the disturbed land to a <br />rangeland and wildlife habitat land use. Some reclamation activities will occur during the life of <br />the mine as areas cease to be used for mining activities. Final reclamation includes sealing the <br />mine portals, removing the surface facilities, and returning all disturbed areas to the approximate <br />original contour. The waste pile will be shaped to blend into adjacent topography. The mine <br />area will be smooth-graded, and compacted areas will be ripped or scarified to eliminate slippage <br />surfaces, establishing a suitable bond for the overlying seedbed material. Topsoil, which has <br />been salvaged during construction of the surface facilities, will be redistributed over the <br />disturbed area. Drainage control will be retained until the revegetation operation is underway <br />and erosion is under control. Following the distribution of topsoil and final grading, the newly <br />shaped surface will be prepared for planting. Surface preparation will include loosening and <br />roughening the surface by disking, harrowing, or dragging. Various conditioners and neutralizers <br />may be used to modify the seedbed conditions to ensure successful establishment of a vegetative <br />cover. The site will then be planted using West Elk's Permanent and Riparian Seeding mix. <br />Various species of shrubs will also be planted. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.