Laserfiche WebLink
Colowyo Coal Compaay <br />Zr7107Aanual Reclamation and Hydrology Report <br />Figuure 11-3 -Topsoil Movements During Report Period <br />T..,.~.,;1 Crr;nn;ne <br />Task Activity Acres Stripped Cubic Yards Placement Area <br /> Stripping Portions of the Southwestern and <br />1 Southeastern sections of Taylor Draw, also the 283.80 828,043 Topsoil Pile 16E <br /> East Fork of Ta for Creek <br />2 Stripping Portions of the X-Pod South of the 13.40 127,327 Topsoil Pile 16D <br /> Section 16 Pit <br />Total Zy/.ZU y»>J/U <br />Tnnenil Ronlaromonr <br />Task Activity Acres Stripped Cubic Yards Placement Area <br />1 EP050 Topsoiled 297.20 103,582 EP050 <br />-I:OLaI L7/.LU 1VJ,JOL <br />• <br />:] <br />Net Changes to Topsoil Stockpile Volume <br />Addition of Volume to Stockpile 955,370 cu yazds <br />Arnaa 1rYPmnt from Tnnsnil Strinnin2 Due to Conditions <br />Task Activity Acres Exempt <br /> Area of steep hillside Northwest of the West Pit 30 <br />0 <br />1 end wall . <br /> Area of steep hillside Northwest of the West Pit 20 <br />0 <br />2 end wall . <br /> Area of steep hillside to the East of 2006 South <br />1 <br />90 <br />3 Taylor Highwall Mining area . <br /> Area of steep hillside to the West of 2006 South <br />12 <br />10 <br />4 Taylor Highwall Mining area . <br /> Area of steep hillside in the East Fork of Taylor <br />7 <br />40 <br />5 Creek drainage . <br />Note: Refer to Exhibit 7 for location of stripping and replacement azeas <br />See Map 28 of the current permit for topsoil stockpile locations <br />Page 11-5 <br />