Laserfiche WebLink
Colowyo Coal Company <br />2t~7Annual Reclamation and Hydrology Report <br />l• <br />FiQUre 3-1 -Completed CDRMS Annual Reclamation Report From <br />Colorado Division of Reclamation, Mining and. Safety <br />Annual Reclamation Report. for the Year 2GY~`1 <br />~ ow !o ~inc- C-~ (-©Iq t.~rJ~ow~/o Gk.(Co~f~~y L•/? <br />~~ine-name '' `` ++ permit # Permittee ~ <br />Address: `~ ~3 ( ~`tG,C-G t'1lW7W ./~Cei(~~ Ca ~J~~I <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />• <br /> <br />Land Status Cate o Last Years <br />Total <br />Cumulative This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed Q <br />385 3 •• <br />l~C + Z9'7. Z = y.151.1 ~ <br />Acres bac~lled and raded F <br />~~ i Z ~'7 ~ + ~ 2' Z = ! ~ sy ' y3 <br />Acres to soiled f~ &3 '~ ~o + 85• (o IS(o~'t• 3h <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />. ~... ,.ti:,. ..a e..~r or,~~o ui rcln <br />tea..,,...,,., ..,. ...,. ..... ....,........_ <br />Last Years .-- ---'--..._-_- <br />Thls --- -~-- -- - ,. <br />Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total ear Total' less ears' <br />Acresseeded• ~56~•~`-~ + ~55•G~ _ ~bfoZ.3Z = 533.3 + I j !~ <br />"InCIUOe, I7 nece55ary, a uescnNuvn yr any auyn~cnrc~a ~cca+n ,y .., ....,..,, ~, N, <br />For the Entire Life of Mine, the total number of acrespdisturbed `7 ~~/ 1 • ~~o and the total number of acres: <br />Phase I released 9/~• 3$ Phase {I released 1~. 3g Phase III released b <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed Zai• 4p <br />For Government Performance and Results Act ~~ // <br />Acreage in long-term mining or reclamaC~tion facilities 2 ~-i 7Z • 7Z- <br />Acreage in active mining areas a Zd F Q• 12-- <br />(exclude acres where Phase 111 release has been achieved) <br />: Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbac~lfed and <br />graded areas of retuse piles, coal mine waste Impoundments, head-of-hollow fills, and valley flits; ventllatlon shafts and entryways; <br />i S and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />' 'Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br /> <br />Page 3-2 <br />