Laserfiche WebLink
NWCC INC. <br />SEDIMENTATION FOND ~ IMROUNDMENT INSPECTION <br />Project: 1-~1(Y ~.y aQ m q.w ~~ ~u- <br />Project no. ,37 Field Engineer(s): 6 - (~Q-~'e~J~''~ <br />Site Name: p~'1 C~ `J Date: c~ (5 bL+ ZS, Z~~ <br />Water Level: 3 Outflow: ~ (Y / N) Sediment Level: I~fi~w+-- " <br />~~~c~rL. <br />ITEM PROBLEMS OBSERVED COMMENTS <br />INSPECTED (circled) <br />UPSTREAM Rip Rap Wave erosion Cracks Sink hole G, ~ ~t,JLIIoWS <br />SLOPE <br />Depressions B Iges Steepness Slides ~~'~ <br />~ ~1/re5'~OG(.G 1L NS lbw <br /> Burrows V eta ' n Concrete L' est ck <br />CREST Ruts Erosion Cracks Sinkhole Width ~~~, <br /> Low Area Surface Draina a Other <br />DOWNSTREAM Erosion Cracks Sinkhole Steepness <br />SLOPE <br /> <br />Depression Bulges Slides Soft Areas ~~ <br /> Ve etation Livestock Bun-ows .Other <br />SEEPAGE Saturated Embankment Point Source <br />~ <br /> Toe See a e Flow Near Outlet <br />PRINCIPAL Poor Operation Deterioration Conduit n~ <br />OUTLET J <br /> Joints Valves Other <br />EMERGENCY Erosion Cracks Flow Obstructed <br />~ <br />SPILLWAY - , <br />5 W <br /> Concrete .Structure <br />MONITORING Damage Vegetation Clogging Rust <br />~a <br />DIVICES 5~ <br /> Other <br />OVERALL Satisfactory Conditionally Operational Unsatisfactory <br />CONDITIONS <br />ITEMS <br />RECOMMENDED <br />FOR ACTION oRS~ <br />ACTION ITEMS <br />REQUIRED FOR ~ <br /> <br />HEALTH & ~~~ <br />SAFETY <br />