My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-04_PERMIT FILE - M2008013
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008013
>
2008-02-04_PERMIT FILE - M2008013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:05 PM
Creation date
3/18/2008 4:28:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008013
IBM Index Class Name
PERMIT FILE
Doc Date
2/4/2008
Doc Name
Adequacy Review Response
From
Carder, Inc.
To
DRMS
Email Name
DEG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G~- <br />CARDER, INC. <br />P.O. BOX 732 <br />LAMAR, CO 81052 <br />PHONE (T19) 336-3479 FAX (719) 336-0196 <br />RECEfVED <br />DEB ~ 4 <br />February 1, 2008 Division of h~eclamation, <br />Mining and Safety <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />~j ~ Attn: Deb Zack <br />' 'v Environmental Protection Specialist <br />,,~~,,,,~~/' RE: Adequacy Review <br />r~ ~ `p.,, Pocojo Pit, M-2008-003, Adequacy Review Response <br />0~ <br />~~~ear Ms. Zack; <br />I received your Adequacy Review Letter and am writing in response to that letter. Please <br />find below answers to your concerns and attachments that you required. <br />Exhibit D-Reclamation Plan <br />1. I have attached a seeding plan that outlines the specific quantity of each grass species to <br />be planted. <br />2. There will not be any haul roads or access roads constructed at the site. Access to the <br />site will be via Cheyenne County Road 17 and you turn right off the county road into <br />the mine area. The entire area will be reclaimed. Therefore, we see no need for a <br />notarized letter from the landowner allowing/requesting the hauUaccess road, to be <br />constructed, be left in place after reclamation is complete. <br />Exhibit E -Map <br />3 and 4. There will be approximately 10,000 (cubic yards) of topsoil stockpiled at the site. <br />The topsoil stockpiles will be located in the south area of the permit boundaries. There will be <br />no overburden or product stockpiles. The topsoil will be stripped and loaders will remove the <br />material and haul to the project site for shouldering material. There will be no processing <br />equipment on site. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.