My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-20_PERMIT FILE - M2007069
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007069
>
2008-02-20_PERMIT FILE - M2007069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:03 PM
Creation date
3/18/2008 4:28:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007069
IBM Index Class Name
PERMIT FILE
Doc Date
2/20/2008
Doc Name
Permit Approval & Bond Calc.
From
DRMS
To
Centennial State Paving
Email Name
DEG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE:.E ::.UIPMENT:.;:<:< .:....................................................................................................................................................................... <br />...................................... <br />Q • . sheet~2~of P <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $48.13 1 $48.13 $48.13 <br />-Flatbed Truck, 6x4, 45K GVW $65.04 1 $65.04 $65.04 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $113.16 $113.16 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.15 0.15 Total non-roadable mob/demob cost " <br />Return time (hours) = 0.15 0.15 'two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost *' <br />Unloading time (hours) = 1.00 NA •' one round trip, no haul rig <br />Subtotals = 2.30 0.30 <br />Fowler <br />6.0 miles <br />40.0 mph <br />$2,110.17 <br />$33.95 <br />JOB TIME AND COST Total job time : 4.60 hours <br />Total job cost : $2,144 <br />
The URL can be used to link to this page
Your browser does not support the video tag.