Laserfiche WebLink
~~ <br />IJ DEVELOPMENT, INC. <br />256 N. MERRILL DRIVE <br />PUEBLO WEST, CO 81007 <br />PHONE:719-240-9424 FAX: 719-583-0768 <br />Date: February 6, 2008 <br />DEB ZACK <br />~' Division of Reclamation, Mining and Safety <br />/~ 1313 Sherman Street, RM 215 <br />Denver, CO 80203 <br />RE: THIRD ADEQUACY REVIEW ~~dc.~oGS ~ ~J <br />FOR M-2007-069 PHEASANT RUN GRAVEL PIT <br />Dear Ms. Zack: <br /> <br />iZEC~IVE® <br /> <br />Division or Reclamation, <br />Mining and Safety <br />This letter will give you the additional items and information you have requested in order <br />to complete the 112c application for M-2007-069 PHEASANT RUN GRAVEL PIT. The <br />Mining Plan and Reclamation Plan have been revised in order to acquiesce to the Rocky <br />Ford High Line Canal Company needs. The Rocky Ford High Line Canal Company and <br />the applicant have negotiated the items that the Canal Company would like to see <br />changed as a result the operator/applicant has agreed to the following. The change will <br />reduce the phases from four {4) down to three {3} and that mining would start on the <br />south side of the canal. Both parties also agreed that mining would not start on the north <br />side until the ditch company agreed to the structural stability report done by Kleinfelder, <br />Inc. a geo-technical engineering company. Then after reviewing the stability report <br />Rocky Ford High Line Canal Company and the applicant would then set the no mining <br />buffer zone adjacent to the ditch. Another item that was revised is that under the bridge in <br />lieu of two {2) feet free board four {4) feet would work better for the ditch company this <br />was agreed to by the applicant. The bridge will be installed over the Canal with <br />permission from the Rocky Ford High Line Canal Company. The ditch company will <br />grant an easement and approve the placement of the bridge and also for the haul road that <br />is on the north side of the ditch and bisects the 200 feet no mining set back. Mining will <br />start on the south side of the ditch. The Reclamation Plan Map has also been revised to <br />reflect the changes mentioned above. A copy of the agreement is also enclosed for the <br />record. <br />Since , <br />¢~/`5 ~ Joe agliano <br />/ Consultant <br />Cc: Centennial State Paving, Inc. <br />Enct: Mining Plan Map two (~) sheets, t2eclama6on Plan Map, Copy of the Agreement <br />COie.i,~~A„~ 7007 iygo S~t'~ 1~2~ <br />