My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-14_REPORT - C1981010 (5)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2008-03-14_REPORT - C1981010 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:25:13 PM
Creation date
3/14/2008 1:03:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REPORT
Doc Date
3/14/2008
Doc Name
2007 Annual Hydrology Report to Appendix A
From
Trapper Mining Inc
To
DRMS
Annual Report Year
2007
Permit Index Doc Type
Hydrology Report
Email Name
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 SURFACE WATER <br />Trapper Mine monitored one stream site and mneteen active NPDES discharge sites during <br />2007. The stream site Flume Gulch (S-1) was sampled during June and September 2007 to <br />characterize spring flows at this location. Fiow was observed at NPDES sites 001, 002, 011, 013, <br />017, 020 and 021 in 2007. Baseline stream site East Pyeatt (S3) is also NPDES site Ol 1. Sites were <br />monitored weekly throughout the year. Sites NPDES 005, 008, 009, 012, 014, 015, 016, 018, 019, <br />022, 023 and 024 did not discharge during 2007. Maps No. 2-1 through 2-3 show the locations of <br />these surface-water sites. <br />4.1 SURFACE-WATER FLOW <br />The 2007 flow data tabulated in Appendix C in Table C-1 represents instantaneous <br />measurements associated with NPDES water-quality sampling. Surface runoff was similar to <br />at the T Mine with the reci itation bein 3.3 inches above av e. <br />normal in 2007 rapper P P g ~ <br />Figures C-1 through C-3 present the instantaneous flow versus time for the Trapper NPDES <br />sites for 2007. Flow occurred during the weekly samples between January 2, 2007 and June 12, <br />2007, and between September 18 and December 26 at NPDES 001. The high flow during sampling <br />was a flow of 179 gpm during three sampling dates in February and March which is lower than <br />normal peak at this site. High flows due to snowmelt at NPDES 001 and NPDES 002 during 2007 <br />were less than average conditions (see Figure C-1). Surface flow at NPDES 011 was observed <br />during several samplings of this site in 2007 (see Figure C-2). Flow occurred during one week <br />from NPDES site 013. Figure C-3 shows that low flow occurred during several weeks at NPDES <br />Site 020 and five peak flows that were greater than 100 gpm occurred from NPDES site 021 during <br />• <br />Trapper Mining Company 4-1 <br />2007 Annual Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.