Colowyo C-1981-019 <br />26 February 2008 ~7 <br />Pg 5/6 ~FJV <br />General Mine Plc~n Compliance: -The 101 dragline is on the East Pit highwall <br />performing reclamation. <br />-The 102 dragline was in the West Pit sitting idle on the E-Seam. As the pit narrows, <br />there are times when only the 103 dragline will be operating. The tentative plan is to <br />walk the 102 out of the pit and use it to perform various reclamation tasks in the West <br />Pit. <br />-The 103 dragline was in the West Pit removing overburden on the E-Seam. <br />-The 114 shovel ~eperation was currently working on removing X-Seam overburden in <br />the X-Pod area. The overburden in this area is so soft that the 114 was free-digging. <br />There was also a large Komatsu loader loading overburden into 793 haul trucks at the <br />X-Pod location. The X-Pod area is the area at the south edge of the Section 16 Pit <br />that was approved for mining with the approval of Technical Revision 65. This is the <br />last of the X-Seai~n coal at the mine, as all of the X coal has been mined from the <br />West Pit. <br />-The 1 15 excavcitor was removing A-Seam overburden at the time of the inspection. <br />-The operator was preparing to shoot the F-Seam overburden in the West Pit. <br />-The mining at tf•ie Colowyo Mine appears to be progressing as discussed and <br />approved in the PAP. <br />Fish and Wildlife: -There were deer and elk basically everywhere on the mine site at <br />the time of the inspection. There was also a lone porcupine walking up a slope <br />along the Sturgeon Road (see picture at the end of this inspection report). <br />Air Resource Pro~iection: -The mine was very wet on 26 February 2008 so there was no <br />problem with fuclitive dust. The majority of the haul roads had dried out by 27 <br />February 2008 so there was some dust being generated. Please remember that even <br />though it is winter, it may still be necessary to water the haul roads, as conditions <br />dictate. <br />Excess Spoil: -The reclaimed portions of the West Pit fill were inaccessible due to <br />snow at the time of the inspection. <br />-The Streeter fill ~Nas partially covered with snow but it appeared to be well <br />vegetated and suable at the time of the inspection. No erosional problems were <br />noted on the fill. This pile has gone through a Phase II bond release. The fill was well <br />vegetated at thE~ time of the inspection. <br />-The Section 161~i11 was inaccessible at the time of the inspection (and will probably <br />remain so until April or May). <br />- The operator hc~s begun construction on portions of the East Taylor fill. The area is <br />clear of topsoil and ready for fill. The underdrain location has been constructed and <br />Colowyo is waiting to get into more competent and larger rock before starting to <br />dump into the fill. The underdrain will be constructed using gravity-sorted rock that <br />will be wing-dumped into the fill. The large rock will then be covered with filter fabric <br />then the excess ~;poil. It is anticipated that the underdrain will be completed in <br />stages as compE~tent rock is encountered. **See pictures at the end of this report** <br />