Laserfiche WebLink
<br />Design Criteria <br />Tonic <br />24 <br />Criteria for the Proposed Action <br />18. Road construction plans would identify specific locations <br />of drainage features and BMPs for approval by the FS <br />engineer/permit administrator prior to construction. <br />19. Road design packages will be submitted to the FS for <br />approval prior to any construction activity. Roads open to <br />the public (Levels 3, 4 & 5) will require written approval <br />prior to any construction activity. <br />20. Protect access roads will be gated and closed year-round <br />to the general public. Personnel with access will be <br />monitored to insure such access is not abused; i.e., no <br />access during non-working hours for purposes unrelated <br />to the project such as hunting or off-roading. <br />Z1. All new access roads constructed for the sole use of this <br />project will be decommissioned by full obliteration when <br />no longer needed for the project and reclaimed. <br />22. Road work will be performed only upon authorization of <br />the District Ranger and comply with the terms of MCC's <br />Road Use Permit. Roads will be designed and constructed <br />to provide maximum stability and protect the surface <br />resource. Best Management Practices will be used in <br />designing the roads and during construction. All roads <br />will be upgraded or constructed to USFS specified <br />standards for either temporary or classified roads, as <br />appropriate and approved by the USFS, with a design <br />speed of 15 miles per hour. <br />23. Surface disturbance will be minimized to the extent <br />reasonably feasible in order to limit potential impacts. <br />Soil that is removed from all new disturbance areas will <br />be windrowed or stockpiled for use in reclamation. <br />Topsoil will be segregated from subsoil and stored at a <br />depth no greater than that prescribed by the Paonia <br />District Ranger. No soil generated from excavation, slide <br />removal or other operations shall be deposited within the <br />WIZ of any drainage with flowing water. <br />E~oad Use <br />Permit (FSM <br />2733.04b <br />and FSM <br />7730) , <br />Forest <br />Service <br />Roads Policy <br />Forest Plan <br />RACR <br />RACR, 36 <br />CFR 228 E, <br />Road Use <br />Permit (FSM <br />2733.04b <br />and FSM <br />7730) <br />Road Use <br />Permit (FSM <br />2733.04b <br />and FSM <br />7730), MCC <br />Project Plan <br />Forest Plan, <br />36 CFR 228 <br />E, MCC <br />Project Plan, <br />Road Use <br />Permit(FSM <br />2733.04b <br />and FSM <br />7730) , <br />WCPH (FSH <br />1 <br />A. <br />