Laserfiche WebLink
BATTLE MOUNTAIN RESOURCES, INC. ''~ <br />March 10, 2008 <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No, M-88-112 '~ <br />February 2008 Monthly Report ~/ <br />Dear Mr. Sorensen: <br />,~ <br />1 <br />v~~ <br />/MAR 13 2008 <br />Division o; ~eciamation, <br />IVlining and Safety <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of February 2008. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on February 28m, no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit monitoring wells on February 28~'. February tailing impoundment piezometer <br />measurements identified these installations were either dry or contained less than 12 inches of <br />water as illustrated in Table 2. Tables 1 and 2 below identify the depth to water measurements <br />collected for each of the site monitoring wells, piezometers and lysimeters as required by the <br />terms and conditions of the TR-32 QAIQC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on <br />February 28"`. The February tailings pond underdrain flow average was 43,23 gpm and a total of <br />480 gallons of water was excavated from the leak detection system yielding a monthly average of <br />16.55 gpad. <br />During February the West Pit water treatment plant operated efficiently discharging a total of <br />7,048,400 gallons (21.63 acre-feet) of water to Rito Seco Creek and a total of 0 gallons (0 acre- <br />feet) of water was transferred from the water treatmenrt plant to the tailings impoundment. <br />Seepage along Rito Seco Creek remained dry during the month. <br />P.O. Aox 310 San Luis, Colorado 81152-0310 • (719) 379-0798 Fax (719) 379-0713 <br /> <br />