Laserfiche WebLink
<br />c <br />Page 5 <br />(j) specify how you will comply with applicable Colorado water laws <br />and regulations governing injury to existing water rights: <br />~j) Not applicable N/A <br />(k) if refuse and acid or toxic producing materials are exposed during <br />mining, describe how they shall be handled and disposed of in a <br />manner that will control unsightliness and protect the drainage system <br />from pollution; <br />(k Not applicable N./A <br />(1) describe what measures will be taken to minimize disturbance to the <br />hydrologic balance, prevent off-site damage, and provide for a stable <br />configuration of the reclaimed area consistent with the proposed future <br />land use; - <br />(1) Runoff will be held to a minimum on site and released thru sand trap <br />(m) specify weather the deposit will be processed on-site. If the deposit <br />will be processed, then describe the nature of the process, facilities and, <br />chemicals utilized. The process area and any structures must be <br />described on Exhibit E -Map; <br />(m) Deposit will be processed on site with screeners and crushers with <br />no chemicals to be used. <br />(n) identify the primary and secondary commodities to be <br />mined/extracted and describe the intended use: and <br />(n) Sand and ravel <br />(o) name and describe the intended use of all expected incidental <br />products to be mined/extracted by the proposed operation. <br />~o) Construction fill material <br />(p) specify if explosives will be used in conjunction with the mining or <br />reclamation. In consultation with the Office, the Applicant must <br />demonstrate, pursuant to Subsection 6.5(4), Geotechnical Stability <br />Exhibit, that off site areas will no be adversely affected by blasting <br />during mining or reclamation operations. <br />gyp) Not applicable N/A <br />6.3.4 Exhibit D -Reclamation Plan <br />(1) The purpose of the Reclamation Plan is to describe the timing, <br />procedures, criteria and materials that will be used to reclaim the <br />affected land to the proposed future land use. This plan must be <br />correlated to Exhibit E -Map. The description of the Reclamation Plan <br />must be adequate to satisfy the requirements of Sections 3.1 and <br />