Laserfiche WebLink
I � Y <br /> I,t <br /> Y <br /> GENERAL BID SPECIFICATIONS <br /> The Colorado Inactive Mine Reclamation Program General Bid Specifications 1993, <br /> which include General Conditions, Standard Work Specifications, and Standard Drawings <br /> and Figures are intended to complement these Special Conditions. The Special <br /> Conditions combined with the General Bid Specifications 1993 form the complete <br /> Invitation and Bid document. Please refer to the Standard Work Specifications for all <br /> applicable types of work required in the Special Conditions. The General Conditions <br /> apply to all work covered in the Special Conditions. Copies of the General Bid <br /> Specifications are available at the Pre-Bid Meeting or from the Division of Minerals and <br /> Geology (DMG), 1313 Sherman Street, Room 215, Denver, Colorado 80203 <br /> (303) 866-3567. <br /> PROJECT START <br /> The project is scheduled with a start up date for October 26, 1993. If your company <br /> cannot schedule construction during this period, please do not bid on this project. A <br /> Notice of Award will be sent to the apparent low bidder within four (4) days of the bid <br /> opening. The Division of Minerals and Geology must receive the required insurance, <br /> bonds and project schedule within fourteen (14) days after the bid opening. At the <br /> expiration of the fourteen days the Division of Minerals and Geology may elect to award <br /> the contract to the next lowest bidder. Bidders are advised to keep close contact with <br /> DMG during this period. <br /> PROJECT SCHEDULE AND PRE-CONSTRUCTION REQUIREMENTS <br /> The project is scheduled for construction between October 26 and December 24, 1993. <br /> A schedule of work items to be completed within this time period must be submitted to <br /> the PROJECT MANAGER for approval prior to the start of construction. The project <br /> schedule shall show time lines of major activities and Bid items, and shall demonstrate <br /> the CONTRACTORS ability to complete the project within the allotted time. <br /> TIME OF COMPLETION <br /> The time of completion allowed for the project is 60 calendar days after receipt of the <br /> Notice to Proceed. Inspection points shall not be completed on weekend days without <br /> prior authorization of the PROJECT MANAGER. <br /> LIQUIDATED DAMAGES <br /> The liquidated damages for this project will be $300.00 per day. Please see "General <br /> Conditions", Numbers 9 and 10. <br /> BID BOND <br /> A bid bond is required for this job. Please see the "General Conditions" Number 4. <br /> 2 <br />