Laserfiche WebLink
distribution truck/trailer to the upper bench. 16 hours will be <br /> guaranteed for machine time . Mobilization to the No . 5 mine site <br /> (approximately 11 miles from Redstone) must be included in the <br /> hourly rate . <br /> REVEGETATION <br /> Besides the outcast waste slope, approximately 2 acres, in total, <br /> are in need of revegetation . In addition to the revegetation <br /> requirements as outlined in the General Specifications book, 2 <br /> tons/acre of mulch will be uniformly worked into the areas to be <br /> revegetated prior, to fertilizer and seeding to an average depth <br /> of 4" . All surfaces to be worked for this phase of the bid are <br /> well within an acceptable grade for drill seeding. Seed will be <br /> provided by the State . <br />