Laserfiche WebLink
ry <br /> 3/4" gravel.will be first placed onto the compacted subgrade. The well-graded riprap <br /> will be to an 18" thickness. Channels on slopes less than 2H:1 V will be constructed <br /> in accordance with the attached drawing(B). The type and installation of riprap or <br /> erosion-control fabric will be as described for 2H:1 V slopes. <br /> S. The time of completion has been extended to 120 days. <br /> 6. In the event that a mid-project shutdown occurs due to weather, Item 8 has been <br /> added to the bid schedule to address remobilization. A revised bid schedule is <br /> attached. <br /> 7. All terms and conditions of the Invitation and Bid other than as changed by this <br /> amendment remain the same. <br /> 8. Receipt and acceptance of this amendment will be acknowledged by returning the <br /> attached Revised Bid Schedule with your bid. <br /> m:\imp\yjb\coa1g1c.bid <br />