My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-05-14_GENERAL DOCUMENTS - C1981053
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981053
>
1993-05-14_GENERAL DOCUMENTS - C1981053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2021 12:11:52 PM
Creation date
3/12/2008 10:31:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981053
IBM Index Class Name
General Documents
Doc Date
5/14/1993
Doc Name
Memo on Work Done at Site -Shrub Planting
From
Paul Krabacher
To
Harry Ranney
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF MINERALS AND GEOLOGY STATE OF CoLa`.Ann <br /> Department of Natural Resources <br /> of Soto <br /> mow'1313 Sherman St.,Room 215 ye \o <br /> Denver,CO 80203 <br /> Phone:(303)866-3567 �" <br /> rr <br /> FAX:(303)832-8106 *1876 a <br /> Roy Romer <br /> May 14, 1993 Governor <br /> Michael B.Long <br /> Division Director <br /> TO : HARRY RANNEY <br /> FROM : ABACHER <br /> RE : L LE L ENERGY/BLUE FLAME C81053 <br /> Approximately 500 shrubs were planted at the mine site . Project <br /> work was completed on May 4, 1993 . Costs totaled $2, 390. 00 for <br /> this Portion . Enclosed is a copy of the bid document . <br /> Considering the amount of precipitation received, the site held <br /> up fairly well. As expected, minor rilling and a small amount of <br /> sediment has been transported off-site . Maintenance work for <br /> establishing furrows and further site stabilization is scheduled <br /> for late summer/fall 1993 . I don 't recommend that any work be <br /> performed on the upper backfilled portal area and that <br /> maintenance work be directed to the staging area, gulley cut <br /> beneath the staging area and lower backfilled sediment pond area. <br /> On-site trash as identified by T . Gillis per inspection report <br /> last month consists of pre-law debris with the exception of minor <br /> lengths of phone cable surfaced with the road pullback and a <br /> length of culvert at the west entrance . These items will be <br /> removed with the maintenance project this fall . <br /> Anticipated future expenditures related to remaining reclamation <br /> work at the Blue Flame Mine are described below. Reconsideration <br /> for retaining the vehicle barrier should be made . If this is <br /> removed, I have no doubt that off road vehicles will enter the <br /> site . Besides a request made from the coal section to remove the <br /> vehicle barrier, minor regrading and revegetation is the only <br /> work envisioned . <br /> Work Scheduled forFall/1993 Date Projected Co§t <br /> Erosion remediation September 27 $ 1, 200 . 00 <br /> furrow construction, <br /> channel reconstruction <br /> Maintenance, reseeding September 27 <br /> berm removal 900 . 00 <br /> TOTAL $ 2, 100 . 00 <br /> CC . ' J McArdle <br /> S Renner <br />
The URL can be used to link to this page
Your browser does not support the video tag.