Laserfiche WebLink
LIST OF FIGURES <br />(See EIS Figure Volume) <br />Figure No. Title Paae <br />1 Red Cliff Mine Project and Coal Lease Areas <br />2 Plan View of Three Adjacent Longwall Panels <br />3 Estimated Gateroad Pillar Loads From Mining First Adjacent Panel <br />4 Load Transfer Distance Data <br />5 Estimated Gateroad Pillar Loads From Mining Second Adjacent Panel <br />6 McClane Canyon Mine Workings <br />7 Subsidence Predicted for Five Selected Panels, McClane Canyon Mine <br />8 Subsidence Over Room-And-Pillar Workings After Pillar Failure <br />9 Localized Mining Induced Slope Angle Changes <br />10 Potential Collapse Heights Above Different Mine Opening Geometries <br />11 Cumulative Percent of Chimney Collapse Height <br />12 Time Interval Between Mining and Surface Breached or Dropped <br />13 Overburden and Outcrop Map for the Project Area <br />14 Estimated Angle of Draw in Relation to Percent Sandstone and Limestone <br />15 Cross Panel Compression Ridge in Alluvium, York Canyon Mine <br />16 Cross Panel Tension Cracks in Alluvium, York Canyon Mine <br />17 Ribside Tension Crack On Steep Slope, York Canyon Mine <br />18 Ribside Tension Cracks in Road Fill and Cliff Face, York Canyon Mine <br />19 Maximum Vertical Subsidence (Smax) With Respect to Panel Width and Depth <br />20 Tension Crack Over Starter Room, York Canyon Mine <br />21 Subsidence Monitoring Program <br />DBMS 292 <br />