Laserfiche WebLink
Kent Gorham <br />March 1, 2008 <br />Page 2 <br />Following completion of the holes, Northfield performed initial reclamation work during July on <br />all areas disturbed as a result of drilling activities. The work included spreading of drill cuttings on <br />the drill pad areas, covering mud pits, redistribution of all available topsoil on the drill pads, and <br />broadcast seeding of the approved seed mixture. Additional road grading was performed where <br />necessary to remove any remaining ruts on the drill trails leading to the NF-O1 and NF-03 drill <br />sites. <br />Northfield has completed all proposed drilling activities as proposed in the approved Notice of <br />Intent and Amendment AM-1. T'he only remaining activities include adequate establishing of <br />vegetation and sealing of the three monitoring wells as required by the reclamation plan. <br />Please contact me at your convenience if you have any questions or require additional information <br />concerning this report. <br />Sincerely, <br />G~ <br />Allen S. Weaver <br />Weaver Engineering Services <br />encl. <br />cc: Scott Leonhart (Northfield) <br />Angela Bellantoni (EAI) <br />