My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-04_INSPECTION - C1981008
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981008
>
2008-03-04_INSPECTION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:27 PM
Creation date
3/11/2008 2:32:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
INSPECTION
Doc Date
3/4/2008
Doc Name
Inspection Report
Inspection Date
2/29/2008
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during the <br />inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br />evidence supporting dhe enforcement action. <br />Topsoil has recently been salvaged from a portion of the Morgan property within the Prime <br />Farmland designated area. Photograph 1 shows the topsoil horizons at this location. WFC is <br />currently drilling in preparation for blasting on Bench 1 in this vicinity. During the inspection it <br />was evident that some Bench 1 material/overburden has sloughed into the active pit. It was <br />apparent that this was Bench 1 material and not topsoil resource that has sloughed off into the pit. <br />Some Bench 1 material is placed along the edge of the bench as a safety berm. Occasionally <br />during maintenance to remove mud accumulating on the bench some material is scraped into the <br />pit. It also appears that some of the berm material has inadvertently fallen into the pit. This <br />sloughing of Bench 1 overburden material has occurred along the entire length of the active pit <br />(see Photo 2). Tlhe Bench 1 area, current drill pad location and safety berm is shown in Photo 3. <br />Photo 4 shows Prime Farmland with the topsoil stockpile constructed ahead of the active pit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.