Laserfiche WebLink
APPROVED JURISDICTIONAL DETERMINATION FORM <br />U.S. Army Corps of Engineers <br />This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook <br />SECTION I: BACKGROUND INFORMATION <br />A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION (JD): <br />B. DISTRICT OFFICE, FILE NAME, AND NUMBER: <br />C. PROJECT LOCATION AND BACKGROUND INFORMATION: CAM Colorado proposes to develop a coal mine facility on <br />approximately 1,886 acres of Bureau of Land Management land at the Red Cliff Mine site in the southwest corner of Garfield County. Development <br />of the mine will also require the construction of approximately 15 miles of rail line on public and private lands in Mesa County to transport coal from <br />the mine facility to the Union Pacific Railroad south of Mack, Colorado. Based on maps of the proposed railroad right of way and the proposed mine <br />facility provided by CAM Colorado, WestWater Biologists surveyed the approximately 2,450 acre project site and surrounding areas to identify and <br />delineate potential wetlands and waters of the U.S.(WOUS) within and adjacent to proposed construction boundaries. At the request of the COE the <br />project was divided into two parts: <br />1. Request for a Jurisdictional Determination identifying potential non-wetland WOUS. <br />2. Request for confirmation of Wetland Delineation and Jurisdictional Determination. <br />This is part 1, Jurisdictional Determination of non-wetland Waters of the US <br />State: CO County/parish borough: Mesa City: Mack <br />Center coordinates of site (lat/long in degree decimal format): Lat. 39.318,° N,Long. -108.8072° E. <br />Universal Transverse Mercator° <br />Name of nearest waterbody: Salt Creek, RPW <br />Name of nearest Traditional Navigable Water (TNW) into which the aquatic resource flows: Colorado River <br />Name of watershed or Hydrologic Unit Code (HCTC): 14010005 <br />® Check if map/diagram of review area and/or potential jurisdictional areas is/are available upon request. <br />® Check if other sites (e.g., offsite mitigation sites, disposal sites, etc...) are associated with this action and are recorded on a different JD <br />form. <br />D. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): <br />^ Office (Desk) Determination. Date: <br />^ Field Determination. Date(s): <br />SECTION II: SUMMARY OF FINDINGS <br />A. RHA SECTION 10 DETERMINATION OF JURISDICTION. <br />There Are no "navigable waters of the U. S." within Rivers and Harbors Act (RHA) jurisdiction (as defined by 33 CFR part 329) in the review area. <br />[RequaredJ <br />^ Waters subject to the ebb and flow of the tide. <br />^ Waters are presently used, or have been used in the past, or may be susceptible for use to transport interstate or foreign commerce. <br />Explain: <br />B. CWA SECTION 404 DETERMINATION OF JURISDICTION. <br />There Are no "waters of the U S."within Clean Water Act (CWA) jurisdiction (as defined by 33 CFR part 328) in the review area. [RequaredJ <br />1. Waters of the U.S. <br />a. Indicate presence of waters of U.S. in review area (check all that apply): r <br />^ TNWs, including territorial seas <br />^ Wetlands adjacent to TNWs <br />^ Relatively permanent waters (RPWs) that flow directly or indirectly into TNWs <br />^ Non-RPWs that flow directly or indirectly into TNWs <br />^ Wetlands directly abutting RPWs that flow dn•ectly or indirectly into TNWs <br />^ Wetlands adjacent to but not directly abutting RPWs that flow directly or indhrectly into TNWs <br />^ Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs <br />^ Impoundments of jurisdictional waters <br />^ Isolated (interstate or intrastate) waters, including isolated wetlands <br />b. Identify (estimate) size of waters of the U.S. in the review area: <br />i Boxes checked below shall be supported by completing the appropriate sections in Section III below. <br />'For purposes of this form, an RPW is defined as a tributary that is not a TNW and that typically flows year-round or has continuous flow at least "seasonally" (e.g., <br />typically 3 months). <br />WestWater Engineering Page 15 of 23 COE Jurisdictional Determination Request <br />DBMS 404 <br />