Laserfiche WebLink
Report Date: 02-Feb-2007 13:12 <br />Calibration History <br />Method /chem/GC_B.i/B013107-1.b/8015.m <br />Start Cal Date: 31-JAN-2007 18:12 <br />End Cal Date 31-JAN-2007 20:48 <br />Initial Calibration <br />Injection Date ~ Sublist ~ Calibration File <br />Cal Level: 1 Cal Amount: 25.00000 <br />~31-JAN-2007 18:12 fall ~/chem/GC B.i/B013107-1.b/sig10002.d <br />---+ <br />Cal Level: 2 Cal Amount: 50.00000 <br />------------ <br />~31-JAN-2007 18:43 all _ -+ <br />/chem/GC B.i/B013107-i.b/sig10003.d <br />-+ <br />Cal Level: 3 Cal Amount: 100.00000 <br />~31-JAN-2007 19:14 all -+ <br />----------------~/chem/GC_B.i/B013107-1.b/sig10004.d <br />------- <br />Cal Level: 4 Cal Amount: 200.00000 <br />I31-JAN-2007 19:46 all ~/chem/GC_B.i/B013107-1.b/sig10005.d <br />Cal Level: 5 Cal Amount: 500.00000 <br />~31-JAN-200720:17 all ~/chem/GC_B.i/B013107-i.b/sig10006.d <br />Cal Level: 6 Cal Amount: 1000.00000 <br />~31-JAN-2007 20:48 fall ~/chem/GC_B.i/B013107-1.b/sig10007.d <br />Continuing Calibration <br />Ccal Level Mode: GLOBAL LEVEL 4 <br />Ccal Level: 4 Ccal Amount: 200.000 <br />I31-JAN-2007 19:46 all ~/chem/GC_B.i/B013107-1 b/sig10005.d <br /> <br />• <br />STL Denver 120 <br />