My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (39)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2008086
>
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (39)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:08 PM
Creation date
3/11/2008 12:37:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2008086
IBM Index Class Name
Application Correspondence
Doc Date
2/22/2008
Doc Name
PDEIS Chapter 4 Environmental Consequences and Mitigation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTERFOUR Environmental Consequences and Mitigation <br />However, siting of the power poles and access roads is flexible; therefore, it is probable that this <br />alternative would be constructed without affecting any significant cultural resources. <br />Transmission Line Alternative C <br />The proposed transmission line corridors have not been surveyed for cultural resources; <br />therefore, it is not known if these features would affect any significant cultural resources. <br />However, siting of the power poles and access roads is flexible; therefore, it is probable that this <br />alternative would be constructed without affecting any significant cultural resources. <br />4.2.3 Paleontology <br />No Action Alternative <br />If the No Action Alternative is selected, no paleontological resources would be disturbed by <br />construction, exploration, or mining. <br />Proposed Action Alternative <br />Mine and Facilities <br />The Wasatch Formation is classified as Class I for paleontological resources. The Wasatch <br />Formation has limited exposures at the highest elevations in the project area. There is a good <br />potential for finding fossils of scientific interest throughout most of the project area. <br />Temporary and Permanent Impacts <br />Ground-disturbing activities have the potential to uncover or destroy paleontological resources. <br />Mitigation Measures <br />If any surface disturbing activities (e.g., vent shafts) are planned on areas underlain by the <br />Wasatch Formation, the site should be surveyed by a qualified paleontologist prior to <br />construction. This would significantly decrease the possibility of fossil destruction. <br />A survey would not be required prior to the BLM authorization for any activities not <br />immediately underlain by the Wasatch Formation. However, if any fossils are noticed at <br />anytime, the Authorized Officer must be notified so the resource can be recorded, evaluated, <br />stabilized, or mitigated. <br />All persons associated with operations under this authorization shall be informed that any objects <br />or sites of paleontological or scientific value, such as vertebrate or scientifically important <br />invertebrate fossils, shall not be damaged, destroyed, removed, moved, or disturbed. If in <br />connection with operations under this authorization, any of the previously mentioned resources <br />are encountered, the operator shall immediately suspend all activities in the immediate vicinity of <br />the discovery that might further disturb such materials and notify the BLM authorized officer of <br />the findings. The discovery must be protected until notified to proceed by the BLM authorized <br />officer. <br />As feasible, the operator shall suspend ground-disturbing activities at the discovery site and <br />immediately notify the BLM authorized officer of any finds. The BLM authorized officer will, <br />as soon as feasible, have aBLM-permitted paleontologist check out the find and record and <br />4-64 <br />DBMS 619 <br />
The URL can be used to link to this page
Your browser does not support the video tag.