Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-2003-001 <br />INSPECTION DATE 02/27/08 <br />INSPECTOR'S INITIALS PSH <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1. PROBLEM: <br />The mine entrance sign was not posted in conformance with Rule <br />3.1.12. <br />CORRECTIVE ACTION: <br />Repost the entrance sign in comformace with Rule 1.6.2(1)(b)to <br />clearly identify the site as the location of a proposed mining <br />operation and submit photographic evidence of the reposted sign to <br />the Division with in 30-days of the inspection. <br />PB or PV:PB <br />TOPIC(S):SM <br />/27/08 _`, -~.,~ <br />~~""~~~ <br />fl_a_„ <br />