My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-10_REPORT - C1981022
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981022
>
2008-03-10_REPORT - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:40 PM
Creation date
3/10/2008 2:53:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REPORT
Doc Date
3/10/2008
Doc Name
2007 Annual Hydrology Report
From
Oxbow Mining, LLC
To
DRMS
Annual Report Year
2007
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />ilatp D2B <br />Water Level (Elevation Ft.) <br />D2B2 <br />January 14, 2005 6044.0 - <br />January 19, 2005 6044.0 - <br />February 22, 2005 6044.6 - <br />March 31, 200:> 6043.6 - <br />May 3, 2005 6044.0 - <br />June 15, 2005 6044.5 - <br />July 11, 2005 6043.6 - <br />August 24, 2005 6044.6 - <br />October, 17, 2005 6045.0 - <br />April 19, 200Ei - 6053 <br />May 25, 2006 6047 - <br />June 7, 2006 - 6066.7 <br />Jul 26, 2006 6047 6070.7 <br />October 17, 2006 6045 - <br />December 27, 2006 6047 6070.7 <br />May 23, 2007 6047 Indeterminate <br />June 19, 200' 6049 Indeterminate <br />August 16, 2007 6049 Indeterminate <br />• After a review of the data, we believe that the transfer of water from D seam to the B seam has <br />had little effect ova the B seam water level. See also the discussion regarding the H-10 well where <br />that monitor well has remained dry. <br />Once a year, samples of water are taken of water transferred to D2B and D2B2 and summarized <br />as follows: No is;sues were encountered with respect to the analytical results. <br /> D2B D2B2 <br />Date H TSS H TSS <br />December 31, 2007 8.72 17 mg/1 8.49 14 mg/1 <br />June 13, 2006 8.58 12 mg/1 8.15 39 mg/1 <br />June 6, 2005 8.57 10 mg/1 NA NA <br />December 28, 2(104 8.53 6 mg/1 NA NA <br />SC-1 Well -Rollins Sandstone <br />Monitor well SC'-1 is located just east of the reclaimed Sanborn Creek mine portal area. <br />Well SC-1 was completed in the Rollins Sandstone, which is located 40 to 50 feet below the B- <br />Seam. Monitoring data were historically collected from well SC-1 prior to any substantial <br />mining in the B-Seam of the Sanborn Creek Mine. The SC-1 well is located up-gradient relative <br />• to the Rollins Sandstone unit which is located stratigraphically under the footprint of the mining <br />activities. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.