Laserfiche WebLink
Agency or organization name : CDRMS <br />Permit or other job action :X--2008-223-09 <br />Task description : Regrade Drill Pads and Mud Pits <br />HOURLY:E::::UIPMENT:C' ::::::.......................................................................................................................................................................... <br />.................... <br />Q OST <br />Basic machine :Cat D9R - 9SU (2005) <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRGI <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cosUhour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br /> <br />.................................................................... <br />MATERIAL::::: UANTITI E' ::::::.................................................................... <br />Q S <br />........................... <br />........................... <br />................................................................................................... <br />.................................................................................................... <br />Initial Swell Loose <br />volume : 8,470 BCY factor : 1.250 volume : 10,588 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />5.00 % (pos) <br />7, 300 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshift/day) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 0.90 (Cat HB) <br />Altitude : 1.00 (Caf HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.35 <br />Adjusted unit production : 741.54 LCY/hr <br />Adjusted fleet production : 741.54 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 14.28 Hours <br />Unit cost : $0.280 /LCY Total job cost : $2,963 <br />