My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (46)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2008086
>
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (46)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:10 PM
Creation date
3/6/2008 9:58:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2008086
IBM Index Class Name
Application Correspondence
Doc Date
2/22/2008
Doc Name
PDEIS Chapter 2 Alternatives
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTERTWO <br />Alternatives <br />2.10.10 Summary of Alternatives <br />Table 2-14, Alternatives Examined in Detail, summarizes the action alternatives by project <br />component that will be examined in detail in this EIS. The No Build alternative will be <br />examined as a baseline case. <br />Table 2-14 <br />ALTERNATIVES EXAMINED IN DETAIL <br />Project Components Alternatives Examined in Detail <br />Means of transporting coal Proposed Action <br />Coal transportation routes and delivery locations • Proposed Action with modifications (Alternative 5) <br /> • CR M 8 grade separation <br /> • Noiseless crossings <br />Electrical power transmission • Proposed Action <br /> • Alternative A <br /> • Alternative B <br /> • Alternative C <br />Sources and routes of water supply Proposed Action <br />Means/locations of waste rock (gob) disposal Proposed Action with modifications <br />Coal lease area Proposed BLM Action <br />Notes: <br />BLM = Bureau of Land Management <br />CR = County Road <br />The "proposed actions with modifications" could be separated into two or more alternatives. <br />However, because these modifications reduce environmental impacts and CAM has adopted <br />them as their proposed actions, there is no reason to further examine the originally proposed rail <br />route/configuration or gob pile. <br />2.11 NO ACTION ALTERNATIVE <br />Under the No Action Alternative, BLM would not grant ROW easements to CAM or GVP, <br />would not approve CAM's land-use application, and would not grant additional coal leases. <br />CAM would continue to mine coal from the McClane Canyon Mine and haul the coal by truck to <br />the Cameo Power plant as long as it is in operation. (Note: Xcel Energy has announced that it <br />will be shutting down the CameoPower plant). <br />If the No Action Alternative is selected, this proposed project would not be built and operated, <br />and production of the 8,000,000 tpy of coal, with the resulting increased local, state, and federal <br />revenues, would be foregone, and the environmental impacts described in Chapter 4, <br />Environmental Consequences, would not occur. <br />The No Action Alternative must be considered pursuant to CEQ requirements, to provide a <br />baseline for comparison with the other alternatives. <br />2-59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.