My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (46)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2008086
>
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (46)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:10 PM
Creation date
3/6/2008 9:58:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2008086
IBM Index Class Name
Application Correspondence
Doc Date
2/22/2008
Doc Name
PDEIS Chapter 2 Alternatives
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTERTWO <br />Alternatives <br />Construction <br />Surfacing a mine access road is atrucking-intensive task. It is estimated this work would be <br />performed over atwo-month period toward the end of the construction project, as shown in <br />Table 2-10, Mine Access Road Material, and Table 2-ll, Mine Access Road Surfacing. <br />Table 2-10 <br />MINE ACCESS ROAD MATERIAL <br />Item Loads Equipment Horsepower <br />Gravel - 80,000 tons 3,200 Gravel trucks 400 <br />Asphalt - 25,000 tons 1,000 Asphalt trucks 400 <br />Total 4,200 <br />Average over 2 months (Loads per day) 100 <br />Notes: <br />*For each piece of equipment. <br />Table 2-11 <br />MINE ACCESS ROAD SURFACING <br />Item Number Shifts/Day Hours/Day Horsepower <br />Motor Grader 2 1 20 180 <br />Compactor 1 1 10 310 <br />Water Truck 1 1 10 400 <br />Notes: <br />*For each piece of equipment. <br />The facilities associated with the proposed mine would be constructed on benches. Benches are <br />carved out of the steep terrain to provide relatively flat surfaces for the mine facilities. Most <br />benches are constructed by excavating the steep slopes and filling ephemeral drainages. The first <br />or upper bench is a utility bench for the water tank. The second or portal bench is developed for <br />a shop, warehouse, raw coal stockpile, reclaim tunnel, and other facilities. The third or material <br />bench is for material storage and parking. The fourth is the office/bathhouse bench. There will <br />also be a coal preparation plant bench and unit train loadout bench. <br />Construction of the associated facilities would be the most labor-intensive part of the project. It <br />is estimated the structure crew would be on site for six to nine months to complete all of the <br />mine structures shown in Table 2-12, Mine Structures. <br />Table 2-12 <br />MINE STRUCTURES <br />Item Number Shifts/Day Hours/Day Horsepower <br />Crane 3 1 30 200 <br />Front-end Wheel Loader 2 1 20 200 <br />Fork Lift 2 1 20 100 <br />Concrete/Gravel Trucks 8 0.3 24 400 <br />Delivery Trucks 4 0.3 12 350 <br />2-53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.