My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (46)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2008086
>
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (46)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:10 PM
Creation date
3/6/2008 9:58:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2008086
IBM Index Class Name
Application Correspondence
Doc Date
2/22/2008
Doc Name
PDEIS Chapter 2 Alternatives
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTERTWO <br />Alternatives <br />Table 2-5 <br />BRIDGE CONSTRUCTION <br />Item Number Shifts/Day Hours/Day Horsepower* <br />Crane/Pile Driver 1 1 10 175 <br />Front-end Wheel Loader 1 1 10 200 <br />Concrete/Gravel Trucks 3 0.3 9 400 <br />Delivery Trucks 1 0.2 2 350 <br />Laborers 6 1 60 N/A <br />Supervisor/Pickup 1 1 10 N/A <br />Notes: <br />*For each piece of equipment. <br />N/A = not applicable <br />A culvert installation crew would support both the rail and portal road construction projects. The <br />rail project requires about 150 culverts that would consume most of the culvert installation <br />crew's time. It is estimated the culvert installation crew would be on site for six months, as <br />shown in Table 2-6, Culvert Installation. <br />Table 2-6 <br />CULVERT INSTALLATION <br />Item Number Shifts/Day Hours/Day Horsepower* <br />Front-end Wheel Loader 1 2 20 200 <br />Track Excavator Backhoe 1 2 20 135 <br />Compactor 1 2 20 75 <br />Delivery Trucks 1 0.5 5 350 <br />Laborers 4 2 80 N/A <br />Supervisor/Pickup 1 2 20 N/A <br />Notes: <br />*For each piece of equipment. <br />N/A = not applicable <br />Track construction would be a labor and truck-delivery intensive operation. Over 4,000 <br />semi-truck loads of material would be required to deliver all of the sub-ballast and track material <br />to the site. The actual track-laying operation would involve stringing material (ties, tie plates, <br />spikes, etc.) out for the length of the track. Most of the ties would likely be constructed of <br />concrete. The rail would probably be delivered by rail in 1,400-foot, continuously welded <br />sections; however, it is possible that it might be delivered by truck in 39-foot sections and <br />welded in place. For Table 2-7, Track Material Delivery, it is assumed that ballast and rail <br />would be delivered by rail. Ties and other track material would be delivered to Mack by rail and <br />transloaded to trucks for delivery to the work site. The duration of this work is anticipated at six <br />months, as shown in Table 2-8, Track Construction. <br />2-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.