My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (46)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2008086
>
2008-02-22_APPLICATION CORRESPONDENCE - C2008086 (46)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:10 PM
Creation date
3/6/2008 9:58:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2008086
IBM Index Class Name
Application Correspondence
Doc Date
2/22/2008
Doc Name
PDEIS Chapter 2 Alternatives
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTERTWO <br />Table 2-2 <br />ALTERNATIVES CONSIDERED SUMMARY <br />Proposed Action Alternatives Considered Reasonableness and Practicability of Altern; <br /> Alternative C - ConsU~uct a U~ansmission line that This altcrnati~~c ~~ould be cntirel~ on BLM-man <br /> follo~~s the proposed action alignment along CR 1~ lands north of the Highline Canal. It ~~ould <br /> to just north of the Highlinc Canal At that point. it consolidate U~ansmission line. ~~atcr pipeline. an <br /> ~~ould di~crgc from the proposed action. U~cnd to the railroad disturbance in a single corridor for <br /> north~~cst then north. and join the proposed railroad approximatcl~ 18.000 feet. GVP indicates that I <br /> alignment 1.800 feet cast of SH I ~9. It ~~ould follo~~ prefer this alta~nati~c to the current proposed ac <br /> the railroad and ~~ata~ pipeline alignment to the mine It ~~ill come ~~ithin I.~00 feet of SH I ~9 and po <br /> site. ~~ill be ~isiblc from the high~~a~. Sonic nc~~ ac <br /> ~~ill be required. <br /> Supply power to mine from substation other than the GVP has completed a system analysis showing 1 <br /> Uintah Substation. energy requirements for the mine are not availal <br /> from any substation other than the Uintah Subst <br /> Construct all or a portion of the transmission line Burying the power lines will substantially incre~ <br /> underground. construction costs. Industry studies show that tl <br /> for underground construction is 8 to 10 times gr <br /> per mile than above ground construction. GVP <br /> estimates construction costs of approximately $: <br /> million/mile vs. $170,000/mile for overhead lin <br /> Burying the power line will have a greater <br /> environmental impact to some resources due to <br /> ground disturbance. Access for repair and <br /> maintenance is more difficult, and outages coulc <br /> substantially longer. <br />Project Component Routes for Delivering Water to Mine Facilities <br />~Vatcr ~~ould be di~crtcd from No feasible alta~nati~cs to di~crting ~~atcr from Placin~~ the pipeline along the proposed railroad <br />Macl: Nash and pumped to Macl. Nash ha~c been identified. Duc to ~~atcr alignment ~~ould ~irtuall~ eliminate the need foi <br />the mine pia pipeline. The allocations. no otha~ di~crsion points arc a~ailablc. additional disturbance for the ~~ata~ pipeline. <br />pipeline ~~ould be consU~uctcd <br />along the railroad ali~~nmcnt. <br />2-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.