My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-04_REPORT - M1977493
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
2008-03-04_REPORT - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:17:23 AM
Creation date
3/5/2008 8:40:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REPORT
Doc Date
3/4/2008
Doc Name
Annual Fee/Report/Map
From
Climax Molybdenum Comapny
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />GENERATOR <br />CERTIFICATION STATEMENT <br />FOR <br />GENERATOR: Parker Ag Services/Climax Mine Composting <br />"1 certify, under penalty of law, that the Grade II metals based requirements in section <br />XXXX 64.12 (A); the appropriate Class A pathogen destruction requirements in sections 64.12 <br />(B)(1) through 64.12 (B)(7) <br />or the appropriate Class B pathogen destruction requirements in sections <br />x 64.12 (B~8) Geometric Means of the density of fecal coliform <br />and the appropriate biosolids stability requirements in sections <br />64.12 (Cx3) - 38% TVSR <br />^ 64.12 (Cx4) -Bench Anaerobic <br />^ 64.12 (C~5) -Bench Aerobic <br />^ 64.12 (C)(6) -Aerobic Digester <br />64.12 (C)(7) -Aerobic Process Sour Test <br />^ 64.12 (C}(8) -Alkaline Stabilization <br />^ 64.12 (C)(9) -Drying (%TSGT70) <br />^ 64.12 (Cx 10) -Drying (%TSGT90) <br />if utilized, have been met. I further certify that the applier has been provided notice of and <br />necessary information to comply with the requirements of the Biosolids Regulation, 64, and <br />specifically with the appropriate biosolids stability requirements in sections <br />^ 64.12 (Cx 11) Subsurface injection <br />x 64.12 (Cx 12) Surface applied with incorporation within six hours <br />^ 64.12 (C)(13) When biosolids that are incorporated into the soil are considered to be Class A <br />with respect to pathogens, the biosolids shall be applied to or placed on the <br />land within eight hours after being discharged from the pathogen treatment <br />process. <br />if utilized, and <br />x the appropriate management practices in sections 64.13, 64.15 and 64.16. <br />This determination has been made under my direction and supervision in accordance with the <br />system designed to ensure that qualified personnel properly gather and evaluate the information <br />used to determine that the pathogen requirements have been met. I am aware that there are <br />significant penalties for false certification including the possibility of fine and imprisonment." <br />DATE: /- ,1~ `S <br />r <br />BY: <br />PRINTED: U C G <br />TITLE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.