Laserfiche WebLink
Vehicular travel on other than established graded and surfaced roads shall be limited by Oxbow <br />Mining LLC to that absolutely necessary to conduct the exploration. Travel will be confined to <br />graded and surfaced roads during periods when excessive damage to vegetation or rutting of the <br />land surface could result. The proposed activities will not require upland diversions, or <br />diversions of ephemeral, intermittent or perennial streams. <br />Drill Site Construction -The Fourteen (14) boreholes proposed in this 2008 exploration <br />program can be summarized by the following information: <br />c;tP ~ Cnrface Rtarus Road Hole Depth Pad size <br />1 ECM-XX-47 Oxbow Fee Existing 1,200 0.25 acre <br />2 ECM-XX-48 Oxbow Fee Existing 1,500 0.25 acre <br />3 ECM-XX-49 BLM License 4,922' 2,450 0.25 acre <br />4 ECM-XX-50 BLM License See 51 2,230 0.25 acre <br />5 ECM-XX-51 BLM License 3,488' 2,240 0.25 acre <br />6 ECM-XX-52 BLM License Existing 1,650 0.25 acre <br />7 ECM-XX-53 BLM License See 49 2,150 0.25 acre <br />8 ECM-XX-54 BLM License See 49 2,215 0.25 acre <br />9 ECM-XX-55 BLM License Existing 2,450 0.25 acre <br />10 ECM-XX-56 Oxbow Fee Existing 1,450 0.25 acre <br />11 ECM-XX-57 BLM License Existing 2,030 0.25 acre <br />12 ECM-XX-58 BLM License Existin 2,350 0.25 acre <br />13 ECM-XX-59 BLM License 972' 2,330 0.25 acre <br />14 ECM-XX-60 BLM License Existing 2,400 0.25 acre <br />Total 9,382' L2S,64J' s.~ acres <br />Most drilling can be conducted with minimal site preparation, since the drill rig can be set-up <br />and leveled using self-contained hydraulic jacks. Where site preparation is necessary due to the <br />need to utilize drilling fluids, a pad having maximum dimensions of approximately 80 feet in <br />width and 130 feet in length will be established. Pad preparation will involve the use of a <br />tracked dozer or backhoe to establish a level drill site. If topsoil exists, up to 12" will be <br />salvaged and stored in a stockpile(s) located along the side of the pad and marked with a <br />"topsoil" sign. Soil stripping will not occur in areas that have been previously disturbed and <br />little or no soil material remains, typically in areas of 30% or greater slopes. The pad sites will <br />be restored to approximate original contour. Shrubs, trees and other organic matter removed <br />during pad preparation may be incorporated onto the regraded surface prior to seeding to <br />enhance reclamation of this disturbed site. <br />Each mud pit will typically be sized approximately 20 feet in length, 4 feet in width and 8 feet <br />deep (23.7 cubic yards each). The pits will generally be located in the "cut" portion of the pad <br />for pad stability. The maximum disturbance area for each drill site is expected to be <br />approximately 0.25 acres. <br />No surface blasting is anticipated. <br />Drilling and Related Activities - 61/4" drill holes will be drilled using rotary or auger drilling <br />methods to the depth of the desired coring interval. In order to avoid potential sample <br />• Page 4 <br />