Laserfiche WebLink
T <br />• 11) THENCE N 90°00'00" E A DISTANCE OF 2025.93' TO INTERSECT <br />THE NORTH-SOUTH CENTERLINE OF SAID SECTION 12; <br />12) THENCE S 0°23'38"EON THE NORTH-SOUTH CENTERLINE OF <br />SAID SECTION 12 A DISTANCE OF 620.43' TO INTERSECT THE SOUTH <br />LINE OF SAID SECTION 12; <br />13) THENCE S 0°16'30"EON THE NORTH-SOUTH CENTERLINE OF <br />SAID SECTION 13 A DISTANCE OF 2653.63' TO THE CENTER OF SAID <br />SECTION 13; <br />14) THENCE S 0°16'30"EON THE NORTH-SOUTH CENTERLINE OF <br />SAID SECTION 13 A DISTANCE OF 1319.00' TO THE NORTHWEST <br />CORNER OF THE SOUTHWEST 1/a OF THE SOUTHEAST ~/a OF SAID <br />SECTION 13; <br />15) THENCE S 44°20'52" W A DISTANCE OF 3768.40' TO INTERSECT <br />THE WEST LINE OF SAID SECTION 24; <br />• 16) THENCE S 77°18'14" W A DISTANCE OF 1391.38'; <br /> 17) THENCE S 57°27'26" W A DISTANCE OF 1267.90'; <br />18) THENCE N 70°54'50" W A DISTANCE OF 2999.78' TO INTERSECT <br />THE WEST LINE OF SAID SECTION 23; <br />19) THENCE N 70°54'50" W A DISTANCE OF 704.15'; <br />20) THENCE N 0°32'10" W A DISTANCE OF 1342.66' TO INTERSECT <br />THE NORTH LINE OF SAID SECTION 22; <br />21) THENCE N 86°47'17"EON THE NORTH LINE OF SAID SECTION 22 <br />A DISTANCE OF 654.47' TO THE POINT OF BEGINNING; <br />Containing 1174 acres, more or less. <br />The following is a description of the documents upon which Northfield <br />bases its legal right to enter those lands within the permit area for the <br />purpose of conducting coal mining operations. <br />• The permit boundary of the mine site is situated within the lands <br />described in the following legal. documents. <br />A. Lease Agreements between Northfield Partners LLC and mineral <br />2.03-9 Revised 2/22/2008 <br />