Laserfiche WebLink
(®EHN 5 ~ Constructi n /'- <br />- FORT COLLINS O I n C. <br />GENERAL CONTRACTORS <br />Asphalt Paving • Crushed Aggregates • Earthmoving • Trucking • Undergroud Utilities • Rotomilling <br />February 29, 2008 <br />Division of Minerals & Geology <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />RE: Timnath Pit, DMG #M-89-056 <br />In reference to our mining operation at the Timnath Pit, we have enclosed a map and a <br />check for the annual fee. <br />All mining has been completed in Phase 1 except the SW corner marked "development", <br />and the NW corner of Phase lA. We will not disturb the creek and adjoining wetlands in <br />Phase lA and 1B at this time. <br />Permanent wetlands are developing in Phase lA, Phase 1B, and Phase 1C. <br />Ground water monitoring wells are in place up gradient of the property as shown on <br />Exhibit C-2. Quarterly reports are attached. <br />Sincerely, <br />~~ <br />Dan Kehn <br />/ph <br />Enclosures <br /> <br />6550 So. County Road 5 • Fort Collins, Colorado 80528 • Phone (970) 226-4111 • FAX (970) 226-4115 <br />807 Murray Road • Cheyenne, Wyoming 82007 • Phone (307) 632-4000 • FAX (307) 632-4016 <br />