Laserfiche WebLink
AVF Monitoring Program. The program includes the following components: hydrologic monitoring, vegetation <br />monitoring, and. subsidence surveying. <br />TCC has constructed the 6MN mine water supply pipeline across the AVF area and under the Fish Creek channel. <br />Specific Best Management Practices (BMP's) were utilized during construction of both the Reservoir and pipeline <br />to minimize any potential for impacts to the AVF. Similarly, potential operational impacts are addressed by <br />implementation of design BMP's in the constructed facilities, along with regular inspection and monitoring. <br /> <br /> <br />MR07-224 2.06-25.7 10/17/07 <br />