Laserfiche WebLink
Annual Impoundment Certification Report <br />Mining Area New Horizon Mine <br />Date Inspected 19February08 <br />Impoundment 012 <br />1. Are there any appearances of erosion, instability, structural weakness or <br />other hazardous conditions? ~o <br />If yes explain <br />2. The depth and elevation of any impounded waters at the time of <br />inspection: Tom„ K_~ ~s 7~ sag ~ ~ <br />3. Existing storage capacity of water in the impoundment (from lowest weep <br />hole or principal spillway) <br />Z , ~ S~v~ -- ~~ <br />4. Design storage capacity of water in the impoundment (from lowest weep <br />hole or principal spillway) <br />5. Any other aspects of the structure affecting stability, or required <br />maintenance? uo <br />6. Has structure been maintained as designed and in accordance with the <br />approved plan and the applicable regulations? 'Y~_s - ~-~, ne-~t ~v ~ u~~ 07 <br />If no explain <br />7. Inflow volume from a 10yr-24Hr storm: ~, ~j-I .~~- ~r <br />8. Capacity of impoundment from lowest weep hole to riser: 3, zCo /y~ - ~" <br />PROFESSIONAL ENGINEER'S STATEMENT <br />I state that this pond was inspected and surveyed under my <br />supervision and all the information presented heron is true and <br />correct to the best of my knowledge and information <br />I q ~~~ ~~ <br />Date Ross L. G k , CO P.E 28950 <br />~rJ f~Ela/~y~ <br />~~~ ~~~,~65 ~,, •,Fq~ <br />sJ~'C) G~`~O <br />v i¢ 28950 ~~ <br />F:\Eng\DATA\WP\pond-banks\2008\2008 Annual Impoundment Certification Report.doc <br />