Laserfiche WebLink
/o l..z <br />/~' RULF. 2 - PERMITS <br />. 2.01 - GENF,RAL REOUIREMF.NTS <br />RULE 2.01.1 - SCOPE <br />D o ~ Dom- i z /~~/~/ <br />sss <br />This section establishes [he minimum several requirements for permits required to commence or continue <br />surface coal mining and reclamation operations. The objectives of this section are to insure that all persons make <br />timely application for permits, and that all surface coal mining and reclamation operations are conducted onh~ <br />under penni[s issued in accordance with the requirements of the Act and these Rules. <br />RESPONSE; <br />No response is necessary; Twentymile Coal Company (TCCj will comply with [he scope of [his section. <br />RULE 2.01.2 - GF,NERAL REQUIREMENTS FOR EXISTING OPERATIONS <br />Not later than two months followine the date of approval of the Colorado regulatory proeram by the <br />Secretan~, all operators who are conducting and intend to conduct surface coal minine operations cieht months <br />after such approval, shall file an application for a permit with the division for such operations. The application <br />shall comply with all applicable provisions of Rules 2 and 4. With regard to the requirements of 2.OS.6(3)(b)(iv), <br />the application shall he considered filed if it contains all applicable hydrologic information reasonably available [o <br />the applicant as of the date of the application <br />• RESPONSE <br />The requirements of [his section are not applicable to this permit revision application. See response [o <br />Rule 2.01.3. <br />RULE 2.01.3 - GENERAL REOUIREMENTS FOR PERMITS FOR ALL SURFACE COAL MINING <br />AND RECLAMATION OPERATIONS <br />E~cents as provided for in 2.01.3(21 and 2.OL3(i), on and after eieht months from the date on <br />which the Colorado regulatory grogram is approved by the Secretary of the Interior, which date is set forth by Rule <br />of the Board, no person shall conduct, on lands within this State, any surface coal mining and reclamation <br />operations unless such person has first obtained a valid permit issued under the applicable provisions of these <br />Rules <br />21 A person conducting surface coal minine and reclamation operations. under a permit issued or <br />amended by the Division in accordance with requirements of the "Colorado Mined Land Reclamation Act" <br />(Section 34-33-101, C.R.S. 1973) and the Rules and Reeulations promulgated therewith and operative in <br />compliance with Section 502 of the Surface Mining Control and Reclamation Act of 1977 (P.L. 95-87), as <br />determined by the Division, may conduct these operations beyond [he period prescribed in (I) above if: <br />(a) A complete application for a permit has been filed with the Division in accordance +vidt <br />a~~licable provision o1'Rules 2 and 4; and <br />(b) The Division has not vet rendered an initial decision with respect to such application. <br />• (3) If prior to [he date of approval by [he Secretary of [he Colorado reeulaton~ prooram, a person has <br />filed with the Division the application for a permit in compliance with the "Colorado Mined Lnnd Reclamation <br />t`4R97-1~4 ?.Ol-I Revised I(1/1)1/97 <br />