2008-02-27_PERMIT FILE - M2008010
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008010
>
2008-02-27_PERMIT FILE - M2008010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:34 PM
Creation date
2/28/2008 11:17:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008010
IBM Index Class Name
PERMIT FILE
Doc Date
2/27/2008
Doc Name
New 112c Application
From
McStone Aggregates, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mud Creek Pit -Reclamation Permit Application - 112 (C) Exhibits Page 9 of 67 <br />EXHIBIT D -Mining Plan <br />SECTION D-7. GENERAL CONCEPT: <br />It is planned that mining will commence as soon as the permit is issued (within 60 days) and begin from the existing <br />pit area, stripping and mining relatively small areas (up to 5 acres at a time), and reclaiming as mining proceeds. <br />Working faces will average 22 feet in height and range from 200 to 600 feet in width. Access above the highwall to <br />the stripped area and the topsoil stockpiles will be via a ramp from the floor of the pit. Loaders will remove material <br />from the working face and feed directly into the processing plant, located as close to the working face as feasible. <br />Based on production levels, portable conveyors or trucks may also be used to haul from the working face to the plant. <br />As much as possible, the floor of the pit will be left at final grade as mining progresses. Berms and shallow swales <br />may be placed for storm water and erosion control, but these generally will be part of final reclamation. If wash water <br />sediment ponds are necessary, these will be located as much as possible in the plant area, or in areas being <br />reclaimed. <br />Based on assumptions as discussed later in this Exhibit, this plan is based on disturbing and mining approximately 5 <br />acres per year. This quantity is subject to change, but the sequence will remain the same. <br />SECTION D-2. PHASES OF MINING: <br />Mining of the site will be done in four broad phases, with the assumptions discussed above (as shown by green <br />arrows on Map C-3): <br />o In Phase I (Year "0"), mining will begin in the existing pit (3.62 acres presently disturbed as shown on Map <br />C-2), cleaning up this area and expanding it to approximately 8.28 acres (Plant Site A, as shown on Map C- <br />3). The existing access will be improved to CDOT standards, and connected to the old pit access road (see <br />Map C-2) to become Road A (on Map C-3). Drainage will be adjusted as necessary for the changed roads, <br />to prevent ponding and improper discharges. Road A is a permanent road, areas disturbed for construction <br />of the road and associated drainage will be reclaimed upon their completion, to cropland or grazing land as <br />appropriate. <br />o In Phase II (Years 1 to 9), mining will be done to the north-northeast along the edge of the natural bench, <br />and then the small area north of the off-site ponds. During this phase, Road B (see Map C-3) will be <br />constructed in segments. Road B is a permanent road, to remain after mining and reclamation is completed, <br />and will provide access to Plant Site B, discussed below (shown on Map C-3). Near the end of Phase II, <br />Road C (see Map C-3) will be constructed, probably in segments. Road C will be a permanent road, but <br />may be reduced in width from the 24-feet shown (and required for pit access) to a narrower traveled way <br />suitable for future field access. <br />o Upon reaching the northeast corner, Phase III mining will again begin at Plant Site A and move to the <br />northeast. (Years 10 to 14). During this phase, Road D (see Map C-3) will be constructed in segments, and <br />is a temporary road. It will be reclaimed following reclamation of Year 20. r <br />o In Phase IV, the final phase, mining will move from Plant Site A to the east and north (Years 15 to 20), using <br />the already-constructed Road D. This phase will require the disturbance and rebuilding of approximately <br />one-half the length of Road A. <br />In each "year" of mining (usually 5 acres), the same routine will be followed. As needed, the haul road will be <br />extended to the planned depth of mining. The entire area will be stripped, with saved topsoil placed in a windrow, <br />generally on the SE side of the area to be mined. The area will then be mined, and reclamation for most of the area <br />will begin immediately. <br />McStone Aggregates, LLC 15 FEB 2008 ©WASTELINE, INC 2008 PN 5006.1-4(009) <br />