Laserfiche WebLink
<br />Hayden Gulch Terminal, Inc. <br />c% Peabody Energy <br />PO Box 670 <br />Hayden, CO 81639 <br />FEB ~. 5 2008 <br />Division of a d Sa ety n, <br />~-iritc-g <br />February 21, 2008 <br />Janet Binns <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />ItE: Hayden-Gulcfi Terminal, ~errrriit C-92-031; Annua~-Hydrology iZepoi-~-"~ J ~` -~- <br />Dear Ms. Binns, <br />HGT hereby informs the Division that the above referenced AHR <br />will be submitted late this year. This is primarily due to the <br />extra work load created by our efforts to get CDPHE stream <br />standards changed. I anticipate that the AHR will be submitted by <br />the end of March, certainly no later than the end of April. <br />Please call me at 970-276-5209 if you have any questions. <br />Sincerely, <br />/~ ..A..~.-~ <br />Dennis Jones <br />Hydrologist I <br />