Laserfiche WebLink
<br />Bowie No. 1 Mine C-81-038 <br />Partial Phase I Bond Release SL-03 <br />Total Loadout Reclamation <br />Task: 000 <br />- <br />Permit Action: j Site: Bowie No. 1 Mine <br />~- ;---- -- --- --- <br />P <br />artial Phase [Bond Release SL-03 _ i Date: 15 -Nov 07 <br />---~- __ <br />_ i User: JRS __ <br /> _- ~ <br />, ; County !Delta <br />Description- - - <br />--- Cost Summary <br />j------- __ ___ <br />- - <br />--1-~ - <br />I~F~Ie Name: _ -- i - <br />~C-1981-038 <br />j <br />_ Task II <br />Reclamation Task Description <br />f- _ <br />Hours <br />- - <br />Dire <br />ct Cast <br /> _ I _ -- <br />~ _ <br />i - <br /> <br />201 ,Seal Loadout Wells ~ Not Released <br />j <br />$0 <br />00 <br />202 _ (Demolish and Remove Structures at Loadout _ __ <br />r <br />525.00 _ <br />. <br />j <br />$1 <br />554 <br />653 <br />00 <br /> <br />203 _ <br />(Combined with Task 202 _ <br />_ _ <br />__, <br />, <br />. <br />_ <br /> <br />204 <br />~ _ <br />Haul Footprints of Loadout Stockpiles to Refuse Area j 0.00 i $0.00 <br /> <br />205 __ <br />Rip Coal Storage/Loadout Area Not Released <br />T Not Released <br />~ ~ $0.00 <br />i <br />$0 <br />00 <br /> <br /> <br />206 _ <br /> <br />_ ~ <br />~ ______ <br /> <br />Ex_cavation/Grading at Storage Area and Loadout _ <br />-- <br />---- <br />I Not Released __ <br />. <br />__ <br />_ <br />~ $0 <br />00 <br />207 _ <br />j _ <br />Grade Railroad Spur -_ - j ---- <br />Not Released . <br />---- - <br />~ $0 <br />00 <br />208 , <br />---7 r __ <br />Finish Grade Railroad Spur _ _ <br />-----.. ~ oN t Released . <br />$0 <br />00 <br /> <br /> <br />209 <br /> <br />~ <br /> <br />Replace Topsoil from Stockpile to Truck Dump Station <br />-- _ <br />j N <br />R <br />l . <br />_ <br />~--- <br /> <br />210 ____ ___ <br />~ _ <br />Reseed Train Loadout and Coal Stockpile Areas_ ot <br />e <br />eased <br />Not Released ~ $0.00 <br />~ $0.00 <br />211 _ o <br />' __ <br />ve Coal Stockpile Pond _ ___ <br />; Not Released $0.00 <br />212 - ; Remove Train_Loadout Pond __ <br />, Not Released $0.00 <br /> -------- - i ------- ---~--- - -- <br /> ~ TotallndirectCosts <br />__ <br />--- <br /> <br />----- <br />------- -- -- i $1,554,653.00 <br /> <br />___ <br /> <br />--- _ -- Lability Insurance (1.55%)___ _ _ <br />_ __ <br />----- - - j $24,097.12 <br />_-__ ___ ! <br />' _ <br />Performance Bond (1.05%) ---__-_ __- i <br />$16,323.86 --~- <br /> ; <br />Profit (10%) ___ __ _ ___ ___ <br />_ _ ~ _____ _ __ _ _ <br />r $155,465.30 <br /> <br />- _ <br />,Job Superintendant (300 hours @ $37.50/hour) -- _- <br />--- -r-- --- <br />_ ~ 525.00 <br />- __ <br />$11,250.00 <br /> <br /> ~Total Contract --------~--- - <br />' ------- - ---- <br />- <br />- ------ ~- $1,761,789.28 <br />~------ ----- <br />- <br />_ -- jEngmeermg Fees (4.25%)_ --- --_-- I <br />------- ----- $74,876.04 <br />i <br />_ - ;Administrative Costs (3.25%) _ _ <br />i $57,258.15 <br /> -- - 1------ ! <br /> <br />-Total SL-3 Applicable Loadout Reclamation -- <br />~ - <br />-- <br />~ $1,893 923.47 <br /> <br /> 60 % of Total SL-3 A licable Loadout Reclamation I j $1,136,354.08 <br />Summary Sheet Page 1 of 1 <br />